JSC «GT Morstroy»
Since 1997 JSC «GT Morstroy»
has designed more than 200 objects.
Port facilities with a total capacity of more than 219 million tons per year
were built and put into operation, which is one fifth of the total capacity of Russian ports.
ACTIVITIES
FRONT END ENGINEERING DESIGN (FEED)
BUSINESS PLANNING
ENGINEERING SURVEYS
DESIGN
DESIGNER SUPERVISION
CERTIFICATION OF HYDROTECHNICAL FACILITIES
24/02/2021
WE RECEIVED THE POSITIVE CONCLUSION BY THE FAU «GLAVGOSEXPERTIZA OF RUSSIA»
NO. EGRZ 41-1-1-3-008055-2021 dated 24.02.2021.
We received a positive conclusion of the repeated state examination of FSUE «GLAVGOSEXPERTIZA of RUSSIA» on the project documentation and results of engineering surveys for the object «Marine transshipment complex of liquefied natural gas in the Kamchatka Territory» no. EGRZ 41-1-1-3-008055-2021 dated 24.02.2021.
11/02/2021
WE RECEIVED THE POSITIVE CONCLUSION BY THE FAU «GLAVGOSEXPERTIZA OF RUSSIA»
NO. 142/GGE DATE 11.02.2021.
We received the positive conclusion from the State Environmental Expertise of the project documentation’s adjustment for «SEA TRANSSHIPMENT COMPLEX OF LIQUEFIED NATURAL GAS IN THE KAMCHATKA REGION»
03/02/2021
COMMISSIONING OF A TEMPORARY TRANSPORTATION OF LIQUEFIED NATURAL GAS IN THE MURMANSK REGION (VPRK LNG)
In the seaport of Murmansk, after test tests, the Temporary offshore liquefied natural gas transshipment complex in the Murmansk region (VPRK LNG) was put into operation. Gas tankers Chrostophe De Margerie, Nikolay Evgenov, Yamal Spirit and more than 10 support vessels were involved in the test trials, which took place in two stages, starting from November 24, 2020.
31/12/2020
RESULTS OF WORK OF THE DESIGN INSTITUTE
CJSC GT MORSTROY FOR 2020.
16/12/2020
We received the positive conclusion by the FAU “Glavgosexpertiza of Russia”
No. 51-1-1-3-065076-2020 dated 16.12.2020.
We received the positive conclusion from the FAU “GLAVGOSEXPERTIZA of RUSSIA” on the project documentation and results of engineering surveys for the object "LNG Marine Transshipment Complex in the Murmansk Region. Stages No. 2 and 3” No. 51-1-1-3-065076-2020 dated 16.12.2020
24/11/2020
THE FIRST TRANSFER OF LIQUEFIED NATURAL GAS FROM AN ICE-CLASS TANKER ARC7 TO A CONVENTIONAL TANKER
NOVATEK-Zapadnaya Arktika, LLC is implementing a project for the construction of a temporary offshore transshipment complex near the Kildin Island of the Murmansk region for the transshipment of liquefied natural gas from ice-class LNG carriers to gas tankers without ice reinforcement with a throughput capacity of 10.5 million tons per year.
25/09/2020
WE RECEIVED THE POSITIVE CONCLUSION FROM THE STATE ENVIRONMENTAL EXPERTISE OF THE PROJECT DOCUMENTATION NO. 1274 date 25.09.2020.
We received the positive conclusion from the State Environmental Expertise of the project documentation «Offshore transshipment complex of liquefied natural gas in the Murmansk region», Order No. 1274 dated 25.09.2020.
11/08/2020
We received the positive conclusion by the FAU “Glavgosexpertiza of Russia”
No. 47-1-1-3-037679-2020 date 11.08.2020.
We obtained the positive conclusion of the FAU «Glavgosexpertiza of Russia» on project documentation and results of engineering surveys for the object «Universal trading terminal «Ust-Luga », order No. 47-1-1-3-037679-2020 date 11.08.2020.
08/06/2020
WE RECEIVED THE POSITIVE CONCLUSION FROM THE STATE ENVIRONMENTAL EXPERTISE OF THE PROJECT DOCUMENTATION NO. 632 date 08.06.2020.
We received the positive conclusion by the FAU “Glavgosexpertiza of Russia” on reliability of determining the estimated cost of construction for the object “Marine transshipment complex of liquefied natural gas in the Kamchatka territory” No. 00016-20/GGE-20796/07-01 of 24.01.2020.
ALL NEWS
NEWS
The largest Russian marine transshipment terminals have become the Company’s hall marks:
St. Petersburg Oil Terminal, the First Container Terminal, Marine Facade, Multipurpose Offshore Transshipment Complex «Bronka» in St. Petersburg, Roads Oil Transshipment Complexes «Belokamenka», «Lavna», «Umba», «Cola» in the Kola Bay, the LNG Seaport «Sabetta» in Yamal, Special Oil Seaport «Kozmino», transshipment complexes in the Ust Luga Commercial Seaport — Container Terminal, Railway Ferry Complex, Multipurpose Reloading Complex «Yug-2», Bulk Cargo Complex, Transshipment Complex of liquefied petroleum gases (LPG), approach channels, water areas and infrastructure facilities of sea ports.
THE QUALITY OF THE PROJECT MEETS ALL REQUIREMENTS AND IS MARKED WITH FEEDBACKS FROM OUR CUSTOMERS
«From the beginning of the project «Sabetta seaport» in 2010 to the commissioning of the project, JSC «GT Morstroy» performed a large complex of design and survey works, took an active part in the construction of port facilities.
OJSC «Yamal LNG» recommends the company as a reliable and long-term partner, demonstrating a creative and professional approach in the execution of complex engineering surveys, development of design and estimate documentation, execution of supervision of Maritime transport infrastructure in difficult conditions of the Arctic».
2017, the General Director of Yamal LNG, OJSС
E. A. Kot
«...I Express my appreciation to the Testing Centre of JSC «GT Morstroy» for the work performed on the engineering survey and inspection of the berth in the port of Novorossiysk. The work was performed in accordance with all terms of the contract and technical requirements in the shortest possible time. The organization of work at the site of the survey and the quality of the reporting materials deserve a positive assessment».
2018, General Director of Container terminal «NUTEP», LLC,
Yu. V. Matvienko
«...In the period from March to May 2018, the specialists of the Testing center of JSC «GT Morstroy» performed work on complex survey and inspection of Palovoi berth of Baltspetsflot, LLC.
«The work was performed efficiently and in the shortest possible time, I Express my gratitude to the employees of the Testing Centre of JSC «GT Morstroy» and hope for further fruitful cooperation».
2018, General Director of BaltSpetsFlot, LLC,
A.I. Shpigel
On the outcome of construction completion and commissioning of the Terminal for receiving, storage and regasification of LNG in the Kaliningrad Region, in January 2019, a letter of thanks was received: “For high professionalism in work and prompt decision-making during the implementation of the project “Terminal for receiving, storage and regasification of liquefied natural gas (LNG) in the Kaliningrad Region”
2019, Member of the Management Board and Head of Department 333, PJSC «Gazprom»
S.F. Prozorov
«The specialists of JSC «GT Morstroy» have performed a comprehensive searching and inspection of the berth No. 2 at the Sayda-Guba Division of the Northwest Center SevRAO– the branch of FSUE «RosRAO».
The works were carried out in strict accordance with technical requirements, requirements of normative documents and terms of the Contract.
We are fully satisfied with quality of the reporting documentation, thank You for the work done and hope for further development of partnership between our organizations».
2019, Director of the North-West Center for radioactive waste management «SevRAO» –the branch of FSUE «Radioactive Waste Management Enterprise «RosRAO»
V. V. Eremenko
Dear colleagues!
I congratulate you and those who have been with us all this time with the timely positive conclusions of the State Expertise on the object "LNG Terminal "Obskiy"! I thank everyone who took an active part in organization and carrying out of design work, as well as support of state examinations with obtaining of positive conclusions! I would like to express my gratitude to the teams who participated in the work. Have a nice weekend and good mood!
2020, Maksim Minin - Head of Division, Marine Port Facilities Engineering Division, Engineering and Investment Department, PJSC «NOVATEK 2»
The work on the inspection of the specialized berth was carried out in strict accordance with the technical design assignment, the regulatory requirements and within terms established by the contract. Considering that the work was carried out under the conditions of an operating regime enterprise, I note the well-established interaction and coordination of work between the services of the enterprise and the Test Center of JSC «GT Morstroy». The quality of the issued reporting materials deserves a positive assessment.
We hereby thank you for the work done and express our hope for the further development of partnerships between our organizations.
2020, Executive Director of JSC "Onezhsky LDK" Varakin A.L.
<
>
all feedback
«WE DESIGN ECONOMIC POWER OF RUSSIA!»
The facilities built by our projects are successfully operated in the Baltic, Barents, Kara, Black, Azov, Caspian, Japanese and Okhotsk seas in the ports of Russia, Finland, Estonia, Latvia, Lithuania and Ukraine.
DEVELOPMENT CONCEPT OF PORT AND TRANSSHIPMENT COMPLEXES
ONSHORE AND OFFSHORE COMPLEXES FOR OF OIL, OIL PRODUCTS, LNG AND LPG RELOADING
PORT TERMINALS FOR GENERAL, BULK, UNIVERSAL CARGO AND HEAVY-WEIGHT EQUIPMENT RELOADING
CONTAINER TERMINALS
FERRY AND PASSENGER COMPLEXES
FACILITIES OF SEAPORT INFRASTRUCTURE
Activities
Front end engineering design (FEED)
Business planning
Engineering surveys
Desing
Desinger supervision
Certification of hydrotechnical facilities