JSC «GT Morstroy»
RESULTS OF WORK
The results of the activities of the Design Institute JSC «GT Morstroy» in 1997-2020:
• 245,97 million t — design cargo turnover of port terminals, constructed on the basis of institute’s projects;
• 63,41 million t — design cargo turnover of port terminals under construction on the basis of institute’s projects.
• 117,2 million m³ of soil is developed during dredging of approach channels and waters on the basis of institute’s projects;
• 6,65 million m³ of soil is under development on the basis of institute’s projects;
• 168,4 million m³ — dredging volume of approach channels and waters under design by the institute.
• 70 fixed berths with total length 13 876 m for vessels with DW from 5 to 150 thousand t were constructed on the basis of institute’s projects;
• 21 fixed berths with total length 6754 m have been constructed since 2014 year on the basis of institute’s projects.
• 74 projects of the Design Institute were approved by FSUE «Glavgosexpertisa of Russia» for the period of 2002 to 2020 with the overall investment volume equal to 555,75 billion rub, including 119,2 billion rub financed from the State budget.
List of GT Morstroy design works approved
by Glavgosexpertiza of Russia as of 31.12.2020
The list of design and survey works performed by the
Design Institute JSC «GT Morstroy» on the territory of the Russian Federation in 1997—2020
DEVELOPMENT CONCEPT OF PORT AND transshipment COMPLEXES
Each port or handling terminal design is based on a carefully developed CONCEPT, which allows determining the purpose, scope of work and technical parameters of the facilities. The concept allows to determinate a rational territory layout, optimization of structures and equipment
read more>>
OIL, OIL PRODUCTS AND LPG transshipment PORT COMPLEXES
The Institute develops projects of specialized marine reloading terminals for export of oil, oil products, Liquefied Petroleum Gas (LPG) and Liquefied Natural Gas (LNG)
read more>>
PORT TERMINALS FOR GENERAL, BULK, UNIVERSAL CARGO AND HEAVY-WEIGHT EQUIPMENT transshipment
The terminals are designed for transshipment of general (metal, wood, industrial products in containers), bulk cargo (coal, ore, fertilizers, grain, building materials, etc.), as well as heavy and large equipment and products from land to sea transport and back
read more>>
CONTAINER TERMINALS
Container terminals provide transshipment of cargo in large-capacity and refrigerated containers from sea to connected types of transport and back, as well as provide temporary storage, customs inspection, packaging of containers and sorting of cargoes.
read more>>
FERRY AND PASSENGER COMPLEXES
In countries with access to the sea, the delivery of goods and passengers has been widely developed by ferry (including rail and RO-RO), passenger ships and cruise liners.
read more>>
FACILITIES OF SEAPORT INFRASTRUCTURE
Infrastructure facilities are necessary to ensure the efficient and safe operation of the seaport as a whole. The developed infrastructure of the port makes it attractive for shipping companies.
read more>>
The list of facilities built upon Design Institute
JSC «GT Morstroy» projects in the period from 2000 to 2020 and successfully operated on the territory of the Russian Federation.
Photo of the facility
Name of the facility
«GT Morstroy»
role
Design stage*
Year of construction completion
Artificial lands creation for the construction of the 5th and 6th Stages of General cargo complex in Ust-Luga Commercial Seaport
General designer
PD,
ESY,
DDD,
DS
2020
Industrial and logistics Park (complex) for storage and transshipment of mineral fertilizers with storage facilities and railway infrastructure on the territory of the municipality “Vistinskiy rural settlement” of the municipality “Kingisepp municipal district” in the Leningrad Region. Marine transshipment terminal, 1stage
General designer
PD,
ESY,
DDD,
DS
2020
Industrial and logistics Park (complex) for storage and transshipment of mineral fertilizers with storage facilities and railway infrastructure on the territory of the municipality “Vistinskiy rural settlement” of the municipality “Kingisepp municipal district” in the Leningrad Region. Creation of operational waters, waterways and artificial land.
General designer
PD,
ESY,
DDD,
DS
2020
Temporary offshore transshipment complex of liquefied natural gas in the Murmansk Region
General designer
PD,
ESY,
DDD,
ES,
DS
2020
Waters of the southern area in Ust-Luga Commercial Seaport within the framework of the construction of “Formation of waters of the southern and northern parts in Ust-Luga Commercial Seaport, including operating waters of container terminal in the Leningrad Region”.
General designer
PD,
DS
2019
Ust-Luga Commercial Seaport. Port protecting structure of the southern waters. Section 2 (2 construction phase). FSUE «Rosmorport»
General designer
PD,
ESY,
DDD,
DS
2018
Construction of the Sea port facilities in the area of Sabetta settement on the Yamal Peninsula, including the creation of a navigable approach channel in the Gulf of Ob
Designer
FEED,
DOI,
PD,
ESY,
DDD,
ES,
DS
2018
Terminal for the reception, storage and regasification of liquefied natural gas (LNG) in the Kaliningrad region
Designer
IS,
FEED,
PD,
ESY,
DDD,
DS,
Certification
2018
The Sakhalin-1 Project. Arrangement of the module unloading area-settlement Odoptu, Stage-2
General designer
PD,
DDD
2017
The temporary offshore transshipment complex for «Kola» storage tanker on the waters of Murmansk port at Cape Filinski
General designer
DOI,
PD,
DDD,
DS
2017
Handling terminal, Murmansk, Kola Bay. Berth No. 2.
OJSC «Norilsk nickel»
General designer
PD,
DDD,
DS
2017
Sea port in the area of Sabetta settement on the Yamal Peninsula. Main facilities of the seaport. The root part of the south-eastern ice barrier facility (SEIBF).
LLC «MRTS Engineering»
Designer
PD,
DDD,
DS
2016
MMTC «Bronka», 2 stage of onshore facilities and structures construction.
LLC «Fenix»
General designer
DOI,
PD,
DDD,
DS
2016
Sea port in the area of Sabetta settlement on the Yamal Peninsula. Preparatory period facilities. Onshore facilities and engineering infrastructure. Construction berths No. 5, 6. OJSC «Yamal LNG»
Designer
PD,
DDD,
DS
2016
Commercial Sea port «Big port of Saint Petersburg».
Logistic area for loaded container storage (site no. 4) on the territory of CJSC «St. Petersburg container terminal» 1st stage
General designer
PD,
DDD
2016
The temporary offshore transshipment complex for «Umba» storage tanker.
LLC «RPK-Nord» Murmansk Region
General designer
DOI,
PD,
DDD,
DS
2016
Saint-Petersburg port. Berthing complex for holding anchorage
of icebreaker fleet of FSUE «Rosmorport»
General designer
PD,
DDD,
DS
2015
Artificial land 2 on the water body: the Gulf of Finland, waters of the seaport «Big port of St. Petersburg», for location of capital structures of federal significance of the MMTC «Bronka», LLC «Fenix»
General designer
PD,
DDD,
DS
2015
MMTC «Bronka».
Linear navigational ranges «Bronka-2» and «Bronka-3» of the first stage
of the approach channel, CJSC «BaltStroy»
General designer
DOI,
PD,
DDD,
DS
2015
Approach channel and waters of MMTC «Bronka».
Reconstruction of St. Petersburg channel, 1 stage of approach channel.
CJSC «BaltStroy»
General designer
DOI,
PD,
DDD,
DS
2015
MMTC «Bronka». 1 stage of onshore facilities and structures constructions.
LLC «Fenix»
General designer
DOI,
PD,
DDD,
DS
2015
Sea port in the area of Sabetta settlement on the Yamal Peninsula. Preparatory period facilities. Onshore facilities and engineering infrastructure.
OJSC «Yamal LNG»
DDD ― General designer; PD ― subcontractor for objects of the preparatory period
DOI,
PD,
DDD,
DS
2015
Sea port in the area of Sabetta settlement on the Yamal Peninsula. Preparatory period facilities. Cargo berths No.1, 2, 3, 4.
OJSC «Yamal LNG»
DDD ― General designer; PD ― subcontractor for objects of the preparatory period
PD,
DDD
2015
Floating passage from the berth No. 45 of OJSC «MMRP»
to the floating jack-up drilling rig «GSP SATURN», Murmansk,
OJSC «Gazpromneft»
General designer
Detailed design drawing
2014
Handling terminal, Murmansk, Kola Bay. Repair of the berth No. 1. OJSC «Norilsk nickel»
General designer
PD,
DDD,
DS
2014
Ust-Luga commercial seaport.
Port protecting structure of the southern waters.
Section 1 (1 construction phase). FSUE «Rosmorport»
General designer
PD,
DDD,
DS
2013
Ust-Luga commercial seaport.
The Liquified Petroleum Gas (LPG) transshipment complex.
JSC «Sibur-Portenergo»
General designer
DOI,
PD,
DDD,
DS
2013
The support fleet base in Ust - Luga commercial seaport. Phase 1. Hydrotechnical structures. FSUE «Rosmorport»
General designer
PD
2013
MMTC «Bronka», CJSC «BaltStroy»:
• Piled foundations of berths No. 5, 6;
• Territory formation;
• The eastern shore protection (200 m), water intakes and outfalls at the berth No. 6.
General designer
DOI,
PD,
DDD,
DS
2013
Waters formation of the southern and northern parts of Ust-Luga commercial seaport. Stages 1, 2, 3, 4, 5.
FSUE «Rosmorport»
General designer
DOI,
PD,
DDD,
DS
2012
Piled foundations of berths No. 1, 2, 3, 4 of Multipurpose Marine Transshipment Complex «Bronka». CJSC «BaltStroy»
General designer
PD,
DDD,
DS
2012
Berth No.2 and dredging operations on the waters of berth No.2 of the sea oil-loading export terminal «Specialized sea oil port Kozmino». FSUE «Rosmorport»
General designer of hydrotechnical part of the complex
DDD,
DS
2012
Ust-Luga commercial seaport.
Bulk cargo complex. OJSC «Rosneftebunker»
Designer of port facilities and structures
PD
2011
Container terminal LLC «Baltic Stevedoring Company».
Structures of 1st stage of 1st phase. LLC «BSK»
General designer
PD,
DDD,
2011
The Sakhalin-1 Project.
Temporary cofferdam. Exxon Neftegas Limited Company
General designer
DDD
2011
The Sakhalin-3 Project. Kiringskoye GCF development. Temporary cofferdam.
OJSC «Mezgregiontruboprovodstroy»
General designer
DDD
2011
Grain terminal complex «Taman».
Cargo berths No. 3 and No. 4
Designer of the hydrotechnical part
DDD
2011
Ust-Luga commercial seaport.
Container terminal. The first construction stage.
CJST «ULKT»
General designer
DOI,
FS (project),
DDD,
DS
2011
Ust-Luga commercial seaport.
Waters formation of the southern and northern parts of Ust-Luga commercial seaport. Stages 4, 5. Navigational beacons of the western ship channel. FSUE «Rosmorport»
General designer
PD
2011
Ust-Luga commercial seaport. Multi-purpose transshipment complex «Yug-2». Offshore and onshore structures of the complex (2nd start-up complex). OJSC «Ust-Luga company»
General designer
FEED,
PD,
DDD,
DS
2010
North European Gas Pipeline «Russia–Germany» (Nord stream).
Handling berths for heavy and construction cargoes
of «Portovaya» CS. OJSC «Giprospetsgaz»
General designer of the pier in the Bay Dalnia
DDD
2010
Baltiysk, Kaliningrad Region.
Reconstruction of entrance piers. FSUE «Rosmorport»
General designer
DDD
2009
Ust-Luga commercial seaport.
Container terminal. Dredging operations on the operational waters of the first start-up complex. FSUE «Rosmorport»
General designer
PD,
DDD,
DS
2009
Ust-Luga commercial seaport.
Automobile and railway ferry complex of the international railway ferry «Ust-Luga–Baltiysk–German ports» (2nd start-up compex). FSUE «Rosmorport»
General designer
IS,
FS,
DDD,
DS
2009
The football stadium in the western part of Krestovskiy Island, St. Petersburg (Kirovskiy stadium). Builder’s berth
General designer
DDD,
DS
2008
Ust-Luga commercial seaport.
Multipurpose transshipment complex «Yug-2» (1st start-up complex). OJSC «Ust-Luga company»
General designer
FEED,
PD,
DDD,
DS
2008
Marine passenger terminal on Vasilyevsky Island
in St. Petersburg («Marine facade»).
Dredging operations at navigable waterway and waters
of the terminal. FSUE «Rosmorport»
General designer
FEED,
DOI,
FS,
PD
2008
Saint-Petersburg seaport.
New section of the approach channel to the navigation pass S-1. Dredging operations at the section from the entrance buoy
to picket PK-352. FSUE «Rosmorport»
Designer of
approach channels
DDD
2008
Marine passenger terminal on Vasilyevsky Island in St. Petersburg («Marine facade»). Leading beacons of ship channel on the hydrotechnical base
. FSUE «Rosmorport»
General designer
PD,
DDD,
DS
2008
Approach section of Kronshtadt ship channel in the mark
of navigation pass S-1. Rear leading beacon ZSZ-2 with 45 m high on the hydrotechnical base
General designer
DDD,
DS
2008
Saint-Petersburg seaport.
First Container Terminal. Extension, process
and equipment improvement, reconstruction of pavement and engineer support facilities. OJSC «PKT»
General designer
C,
DDD,
DS
2007
Marine passenger terminal on Vasilyevsky Island
in St. Petersburg («Marine facade»). Leading beacons on the hydrotechnical base of the Petrovskii fairway. FSUE «Rosmorport»
General designer
PD,
DDD,
DS
2007
Railway ferry complex in the basin No.4 in Baltiysk,
Kaliningrad region.
Dredging operations on navigable waterway and waters
of the complex. FSUE «Rosmorport»
General designer
PD
2006
Ust-Luga commercial seaport. Automobile and railway ferry complex. Dredging operations on the operational waters of the complex. FSUE «Rosmorport»
General designer
IS,
FS,
DDD,
DS
2006
Taganrog Shipyard:
— Grain terminal. Ship repairing berth — big repair;
—Hydrotechnical facilities of
oil products transshipment complex
General designer of the hydrotechnical
DDD.
DS
2005,
2006
Automobile ferry complex in Baltiysk, Kaliningrad region. Container terminal.
General designer
PD,
DDD
2006
Ust-Luga commercial seaport. International railway ferry «Ust- Luga–Baltiysk–German ports».
Automobile and railway ferry complex(1st start-up complex). FSUE «Rosmorport»
General designer
IS,
FS,
DDD,
DS
2006
Railway ferry complex in the basin No.4 of Baltiysk.
Complex of hydrotechnical and onshore facilities. FSUE «Rosmorport»
General designer
FS (project),
DDD,
DS
2006
Chornaya river of Leningrad region.
Handling point for heavy and large equipment
of LLC «KINEF»
Designer of the hydrotechnical engineering part of the terminal
DDD
2005
Vysotsk port. Oil products distributional and handling complex LUKOIL-II. Dredging operations in navigable passage and waters of the terminal
General designer
DDD,
DS
2005
Vysotsk port. Oil products distributional and handling complex LUKOIL-II. Hydrotechnical structures of the complex
Designer of the hydrotechnical engineering part of the terminal
DDD,
DS
2004
Bridge crossing over Neva river at section No.2 of the first stage of St. Petersburg Ring Road.
The berth for river passenger vessels and ice barrier
Designer of the hydrotechnical engineering part of the terminal
FS (project),
DDD
2003
Saint Petersburg seaport.
Combined terminal of rolling cargoes and containers on the berth No.101
General designer
DDD,
DS
2003
Offshore oil transshipment complex on the inner roadstead of Kola Bay, further south than Mishukov Cape.
Inshore mooring of the carrier tanker
General designer
DOI,
DDD,
DS
2003
Grain terminal, city of Azov.
Berthing facilities of the grain terminal
Designer of the hydrotechnical part of the complex
DDD,
DS,
2003
Murmansk port. The coal terminal at the berth No.4. Retrofitting of the berth to ensure receipt of «Panamax» type ships.
General designer
FEED,
DDD,
DS
2003
Cargo and passenger ferry terminal in the basin No. 3 of Baltiysk, Kaliningrad region.
Berths No.1, 2. Onshore facilities
Designer of the hydrotechnical part of the terminal
DDD
2003
Saint-Petersburg seaport.
St. Petersburg oil terminal. Hydrotechnical structures of berths No. 3, 4
Designer of the hydrotechnical part of the complex
FEED,
DDD,
DS
2003
Offshore oil transshipment complex in the area
of Belokamenka settlement on the waters of Kola Bay.
Inshore mooring of the storage tanker
General designer
DOI,
DDD,
DS
2003
Saint-Petersburg seaport.
Baltiysk bulk terminal. Berth No. 107 in the coal port
Designer of the hydrotechnical part of the complex
FS,
DDD,
DS
2002
Yeysk Seaport.
Bank slopes, berth, quay No. 2 — big repair
Designer of hydrotechnical part
and utility networks
DDD
2002
LLC «Lukoil-Kaliningradmorneft»
Reconstruction of berth No.3 to ensure the construction
of unitized units of «D-6» oil producing platform
Designer of hydrotechnical part
and utility networks
FEED,
DDD,
DS
2001
Saint-Petersburg seaport.
St. Petersburg oil terminal. Retrofitting of bunker berth
No. 99
General designer
FEED,
DDD,
DS
2001
Saint-Petersburg seaport.
St. Petersburg oil terminal. Hydrotechnical structures of berths No. 1, 2
Designer of the hydrotechnical part of the complex
FEED,
РП,
DS
2000
Saint-Petersburg seaport.
St. Petersburg oil terminal. Hydrotechnical structures of berths
No. 112 «a»
Designer of the hydrotechnical part of the complex
FEED,
РП,
DS
2000
* Legend Design stages:
IS — Investment Substantiation
C — Concept;
DOI— Declaration of Intentions;
FEED — Front end engineering design;
FS (project) — Feasibility Study (project);
PD — Project Documentation;
DDD — Detailed Design Documentation;
DS — Design Supervision.
Activities
Front end engineering design (FEED)
Business planning
Engineering surveys
Desing
Desinger supervision
Certification of hydrotechnical facilities