The results of the activities of the Design Institute JSC «GT Morstroy» in 1997-2020:

 

245,97 million t — design cargo turnover of port terminals, constructed on the basis of institute’s projects;

63,41 million t — design cargo turnover of port terminals under construction on the basis of institute’s projects.

 

117,2 million m³ of soil is developed during dredging of approach channels and waters on the basis of institute’s projects;

6,65 million m³ of soil is under development  on the basis of institute’s projects;

168,4  million m³ — dredging volume of approach channels and waters under design by the institute.

 

70 fixed berths with total length 13 876 m for vessels with DW from 5 to 150 thousand t were constructed on the basis of institute’s projects;

21 fixed berths with total length 6754 m have been constructed since 2014 year on the basis of institute’s projects.

 

74 projects of the Design Institute were approved by FSUE «Glavgosexpertisa of Russia» for the period of 2002 to 2020 with the overall investment volume equal to 555,75 billion rub, including 119,2 billion rub financed from the State budget.

DEVELOPMENT CONCEPT OF PORT AND transshipment COMPLEXES

Each port or handling terminal design is based on a carefully developed CONCEPT, which allows determining the purpose, scope of work and technical parameters of the facilities.  The concept allows to determinate a rational territory layout, optimization of structures and equipment

read more>>

OIL, OIL PRODUCTS AND LPG transshipment PORT COMPLEXES

The Institute develops projects of specialized marine reloading terminals for export of oil, oil products, Liquefied Petroleum Gas (LPG) and Liquefied Natural Gas (LNG)

 

read more>>

PORT TERMINALS FOR GENERAL, BULK, UNIVERSAL CARGO AND HEAVY-WEIGHT EQUIPMENT transshipment

The terminals are designed for transshipment of general (metal, wood, industrial products in containers), bulk cargo (coal, ore, fertilizers, grain, building materials, etc.), as well as heavy and large equipment and products from land to sea transport and back

read more>>

CONTAINER TERMINALS

Container terminals provide transshipment of cargo in large-capacity and refrigerated containers from sea  to connected types of transport and back, as well as provide temporary storage, customs inspection, packaging of containers and sorting of cargoes.

 

read more>>

FERRY AND PASSENGER COMPLEXES

In countries with access to the sea, the delivery of goods and passengers has been widely developed by ferry (including rail and RO-RO), passenger ships and cruise liners.

 

read more>>

FACILITIES OF SEAPORT INFRASTRUCTURE

Infrastructure facilities are necessary to ensure the efficient and safe operation of the seaport as a whole. The developed infrastructure of the port makes it attractive for shipping companies.

read more>>

The list of facilities built upon Design Institute
JSC «GT Morstroy» projects in the period from 2000 to 2020 and successfully operated on the territory of the Russian Federation.

Photo of the facility

Name of the facility

«GT Morstroy»

role

Design stage*

Year of construction completion

Artificial lands creation for the construction of the 5th and 6th Stages of General cargo complex in Ust-Luga Commercial Seaport

General designer

PD,
ESY,
DDD,
DS

2020

Industrial and logistics Park (complex) for storage and transshipment of mineral fertilizers with storage facilities and railway infrastructure on the territory of the municipality “Vistinskiy rural settlement” of the municipality “Kingisepp municipal district” in the Leningrad Region. Marine transshipment terminal, 1stage

 General designer

PD,
ESY,
DDD,
DS

2020

Industrial and logistics Park (complex) for storage and transshipment of mineral fertilizers with storage facilities and railway infrastructure on the territory of the municipality “Vistinskiy rural settlement” of the municipality “Kingisepp municipal district” in the Leningrad Region. Creation of operational waters, waterways and artificial land.

General designer

 PD,
ESY,
DDD,
DS

2020

Temporary offshore transshipment complex of liquefied natural gas in the Murmansk Region

General designer

PD,
ESY,
DDD,
ES,
DS

2020

Waters of the southern area in Ust-Luga Commercial Seaport within the framework of the construction of “Formation of waters of the southern and northern parts in Ust-Luga Commercial Seaport, including operating waters of container terminal in the Leningrad Region”.

General designer


PD,
DS

2019

Ust-Luga Commercial Seaport. Port protecting structure of the southern waters. Section 2 (2 construction phase). FSUE «Rosmorport»

General designer

PD,
ESY,
DDD,
DS

2018

Construction of the Sea port facilities in the area of Sabetta settement on the Yamal Peninsula, including the creation of a navigable approach channel in the Gulf of Ob

Designer

FEED,
DOI,
PD,
ESY,
DDD,
ES,
DS

2018

Terminal for the reception, storage and regasification of liquefied natural gas (LNG) in the Kaliningrad region

 Designer

IS,
FEED,
PD,
ESY,
DDD,
DS,
Certification

2018

The Sakhalin-1 Project. Arrangement of the module unloading area-settlement Odoptu, Stage-2

General designer

 

PD,

DDD

2017

The temporary offshore transshipment complex for «Kola» storage tanker on the waters of Murmansk port  at Cape Filinski

General designer

DOI,

PD,

DDD,

DS

2017

Handling terminal, Murmansk, Kola Bay. Berth No. 2.
OJSC «Norilsk nickel»

General designer

PD,

DDD,

DS

2017

Sea port in the area of Sabetta settement on the Yamal Peninsula. Main facilities of the seaport. The root part of the south-eastern ice barrier facility (SEIBF).

LLC «MRTS Engineering»

 Designer

PD,

DDD,

DS

2016

MMTC «Bronka», 2 stage of onshore facilities and structures construction.

LLC «Fenix»

General designer

DOI,

PD,

DDD,

DS

2016

Sea port in the area of Sabetta settlement on the Yamal Peninsula.  Preparatory period facilities. Onshore facilities and engineering infrastructure. Construction berths No. 5, 6. OJSC «Yamal LNG»

Designer

PD,

DDD,

DS

2016

Commercial Sea port «Big port of Saint Petersburg».

Logistic area for loaded container storage (site no. 4) on the territory of CJSC «St. Petersburg container terminal» 1st stage

General designer

PD,

DDD

2016

The temporary offshore transshipment complex for «Umba» storage tanker.

LLC «RPK-Nord»   Murmansk Region

 General designer

DOI,

PD,

DDD,

DS

2016

Saint-Petersburg port. Berthing complex for holding anchorage

of icebreaker fleet of FSUE «Rosmorport»

General designer

PD,

DDD,

DS

2015

Artificial land 2 on the water body: the Gulf of Finland, waters of the seaport «Big port of St. Petersburg», for location of capital structures of federal significance of the MMTC «Bronka», LLC «Fenix»

General designer

PD,

DDD,

DS

2015

MMTC «Bronka».

Linear navigational ranges «Bronka-2» and «Bronka-3» of the first stage

of the approach channel, CJSC «BaltStroy»

General designer

DOI,

PD,

DDD,

DS

2015

Approach channel and waters of MMTC «Bronka».

Reconstruction of St. Petersburg channel, 1 stage of approach channel.

CJSC «BaltStroy»

 General designer

DOI,

PD,

DDD,

DS

2015

MMTC «Bronka». 1 stage of onshore facilities and structures constructions.

LLC «Fenix»

General designer

DOI,

PD,

DDD,

DS

2015

Sea port in the area of Sabetta settlement on the Yamal Peninsula.  Preparatory period facilities. Onshore facilities and engineering infrastructure.

OJSC «Yamal LNG»

DDD ― General designer;                PD ― subcontractor for objects of the preparatory period

DOI,

PD,

DDD,

DS

2015

Sea port in the area of Sabetta settlement on the Yamal Peninsula.  Preparatory period facilities. Cargo berths No.1, 2, 3, 4.

OJSC «Yamal LNG»

DDD ― General designer;                PD ― subcontractor for objects of the preparatory period

PD,

DDD

2015

Floating passage from the berth No. 45 of OJSC «MMRP»

to the floating jack-up drilling rig «GSP SATURN», Murmansk,

OJSC «Gazpromneft»

 General designer

Detailed design drawing

2014

Handling terminal, Murmansk, Kola Bay. Repair of the berth No. 1. OJSC «Norilsk nickel»

General designer

PD,

DDD,

DS

2014

Ust-Luga commercial seaport.

Port protecting structure of the southern waters.

Section 1 (1 construction phase). FSUE «Rosmorport»

General designer

 PD,

DDD,

DS

2013

Ust-Luga commercial seaport.

The Liquified Petroleum Gas (LPG) transshipment complex.

JSC «Sibur-Portenergo»

General designer

DOI,

PD,

DDD,

DS

2013

The support fleet base in Ust - Luga commercial seaport. Phase 1. Hydrotechnical structures. FSUE «Rosmorport»

 General designer

 

PD

 

2013

MMTC «Bronka», CJSC «BaltStroy»:

• Piled foundations of berths No. 5, 6;

• Territory formation;

• The eastern shore protection (200 m), water intakes and outfalls at the berth No. 6.

General designer

DOI,

PD,

DDD,

DS

2013

Waters formation of the southern and northern parts of Ust-Luga commercial seaport. Stages 1, 2, 3, 4, 5.

FSUE «Rosmorport»

General designer

DOI,

PD,

DDD,

DS

2012

Piled foundations of berths No. 1, 2, 3, 4 of Multipurpose Marine Transshipment Complex «Bronka». CJSC «BaltStroy»

General designer

PD,

DDD,

DS

2012

Berth No.2 and dredging operations on the waters of berth No.2 of the sea oil-loading export terminal «Specialized sea oil port Kozmino». FSUE «Rosmorport»

 General designer of hydrotechnical part of the complex

DDD,

DS

2012

Ust-Luga commercial seaport.

Bulk cargo complex. OJSC «Rosneftebunker»

Designer of port facilities and structures

PD

2011

Container terminal LLC «Baltic Stevedoring Company».

Structures of 1st stage of 1st phase. LLC «BSK»

General designer

PD,

DDD,

 

2011

The Sakhalin-1 Project.

Temporary cofferdam.  Exxon Neftegas Limited Company

General designer

DDD

2011

The Sakhalin-3 Project. Kiringskoye GCF development. Temporary cofferdam.

OJSC «Mezgregiontruboprovodstroy»

 General designer

DDD

2011

Grain terminal complex «Taman».

Cargo berths No. 3 and No. 4

Designer of the hydrotechnical part

DDD

2011

Ust-Luga commercial seaport.

Container terminal. The first construction stage.

CJST «ULKT»

General designer

DOI,

FS (project),

DDD,

DS

2011

Ust-Luga commercial seaport.

Waters formation of the southern and northern parts of Ust-Luga commercial seaport. Stages 4, 5. Navigational beacons of the western ship channel. FSUE «Rosmorport»

General designer

PD

2011

Ust-Luga commercial seaport. Multi-purpose transshipment complex «Yug-2». Offshore and onshore structures of the complex (2nd start-up complex). OJSC «Ust-Luga company»

 General designer

FEED,

PD,

DDD,

DS

2010

North European Gas Pipeline «Russia–Germany» (Nord stream).

Handling berths for heavy and construction cargoes

of «Portovaya» CS.  OJSC «Giprospetsgaz»

General designer of the pier in the Bay Dalnia

DDD

2010

Specialized sea oil port «Kozmino».

The first stage of pipeline system «Eastern Siberia– the Pacific ocean».

Marine structures of the port.

General designer

of the hydrotechnical part of the complex

 

DDD,

DS

2009

Baltiysk, Kaliningrad Region.

Reconstruction of entrance piers. FSUE «Rosmorport»

General designer

 

DDD

 

2009

Ust-Luga commercial seaport.

Container terminal. Dredging operations on the operational waters of the first start-up complex. FSUE «Rosmorport»

 General designer

PD,

DDD,

DS

2009

Ust-Luga commercial seaport.

Automobile and railway ferry complex of the international railway ferry «Ust-Luga–Baltiysk–German ports» (2nd start-up compex). FSUE «Rosmorport»

General designer

IS,

FS,

DDD,

DS

2009

The football stadium in the western part of Krestovskiy Island, St. Petersburg (Kirovskiy stadium). Builder’s berth

General designer

 

DDD,

DS

2008

Ust-Luga commercial seaport.

Multipurpose transshipment complex «Yug-2» (1st start-up complex). OJSC «Ust-Luga company»

General designer

FEED,

PD,

DDD,

DS

2008

Marine passenger terminal on Vasilyevsky Island

in St. Petersburg («Marine facade»).

Dredging operations at navigable waterway and waters

of the terminal. FSUE «Rosmorport»

 General designer

FEED,

DOI,

FS,

PD

2008

Saint-Petersburg seaport.

New section of the approach channel to the navigation pass S-1. Dredging operations at the section from the entrance buoy

to picket PK-352. FSUE «Rosmorport»

Designer of

approach channels

 

DDD

2008

Marine passenger terminal on Vasilyevsky Island in St. Petersburg («Marine facade»). Leading beacons of ship channel on the hydrotechnical base

. FSUE «Rosmorport»

General designer

PD,

DDD,

DS

2008

Approach section of Kronshtadt ship channel in the mark

of navigation pass S-1. Rear leading beacon ZSZ-2 with 45 m high on the hydrotechnical base

General designer

DDD,

DS

2008

Saint-Petersburg seaport.

First Container Terminal. Extension, process

and equipment improvement, reconstruction of pavement and engineer support facilities.  OJSC «PKT»

 General designer

C,

DDD,

DS

2007

Marine passenger terminal on Vasilyevsky Island

in St. Petersburg («Marine facade»). Leading beacons on the hydrotechnical base of the Petrovskii fairway. FSUE «Rosmorport»

General designer

PD,

DDD,

DS

2007

Railway ferry complex in the basin No.4 in Baltiysk,

Kaliningrad region.

Dredging operations on navigable waterway and waters

of the complex. FSUE «Rosmorport»

General designer

  PD

2006

Ust-Luga commercial seaport. Automobile and railway ferry complex. Dredging operations on the operational waters of the complex. FSUE «Rosmorport»

General designer

IS,

FS,

DDD,

DS

2006

Taganrog Shipyard:

— Grain terminal. Ship repairing berth — big repair;

—Hydrotechnical  facilities of

oil products transshipment complex

 General designer of the hydrotechnical

DDD.

DS

2005,

2006

Automobile ferry complex in Baltiysk,  Kaliningrad region. Container terminal.

General designer

PD,

DDD

2006

Ust-Luga commercial seaport. International railway ferry «Ust- Luga–Baltiysk–German ports».

Automobile and railway ferry complex(1st start-up complex). FSUE «Rosmorport»

General designer

 IS,

FS,

DDD,

DS

2006

Railway ferry complex in the basin No.4 of Baltiysk.

Complex of hydrotechnical and onshore facilities. FSUE «Rosmorport»

General designer

FS (project),

DDD,

DS

2006

Chornaya river of Leningrad region.

Handling point for heavy and large equipment

of LLC «KINEF»

 Designer of the hydrotechnical engineering part of the terminal

 

DDD

 

2005

Vysotsk port. Oil products distributional and handling complex LUKOIL-II. Dredging operations in navigable passage and waters of the terminal

General designer

 

DDD,

DS

2005

Vysotsk port. Oil products distributional and handling complex LUKOIL-II. Hydrotechnical structures of the complex

Designer of the hydrotechnical engineering part of the terminal

DDD,

DS

2004

Bridge crossing over Neva river at section No.2 of the first stage of St. Petersburg Ring Road.

The berth for river passenger vessels and ice barrier

Designer of the hydrotechnical engineering part of the terminal

FS (project),

DDD

2003

Saint Petersburg seaport.

Combined terminal of rolling cargoes and containers on the berth No.101

 General designer

DDD,

DS

2003

Offshore oil transshipment complex on the inner roadstead of Kola Bay, further south than Mishukov Cape.

Inshore mooring of the carrier tanker

General designer

DOI,

DDD,

DS

2003

Grain terminal, city of Azov.

Berthing facilities of the grain terminal

Designer of the hydrotechnical part of the complex

DDD,

DS,

 

2003

Murmansk port. The coal terminal at the berth No.4. Retrofitting of the berth to ensure receipt of «Panamax» type ships.

General designer

FEED,

DDD,

DS

2003

Cargo and passenger ferry terminal in the basin No. 3 of Baltiysk, Kaliningrad region.

Berths No.1, 2. Onshore facilities

Designer of the hydrotechnical part of the terminal

DDD

2003

Saint-Petersburg seaport.

St. Petersburg oil terminal. Hydrotechnical structures of berths No. 3, 4

Designer of the hydrotechnical part of the complex

FEED,

DDD,

DS

2003

Offshore oil transshipment complex in the area

of Belokamenka settlement on the waters of Kola Bay.

Inshore mooring of the storage tanker

General designer

DOI,

DDD,

DS

2003

Saint-Petersburg seaport.

Baltiysk bulk terminal. Berth No. 107 in the coal port

 

 

Designer of the hydrotechnical part of the complex

FS,

DDD,

DS

2002

Yeysk Seaport.

Bank slopes, berth, quay No. 2 — big repair

 Designer of hydrotechnical part

and utility networks

 

DDD

2002

LLC «Lukoil-Kaliningradmorneft»

Reconstruction of berth No.3 to ensure the construction

of unitized units of «D-6» oil producing platform

Designer of hydrotechnical part

and utility networks

FEED,

DDD,

DS

2001

Saint-Petersburg seaport.

St. Petersburg oil terminal. Retrofitting of bunker berth

No. 99

General designer

FEED,

DDD,

DS

2001

Saint-Petersburg seaport.

St. Petersburg oil terminal. Hydrotechnical structures of berths No. 1, 2

Designer of the hydrotechnical part of the complex

FEED,

РП,

DS

2000

Saint-Petersburg seaport.

St. Petersburg oil terminal. Hydrotechnical structures of berths

No. 112 «a»

 Designer of the hydrotechnical part of the complex

FEED,

РП,

DS

2000

* Legend Design stages:

IS — Investment Substantiation

C — Concept;

DOI— Declaration of Intentions;

FEED — Front end engineering design;

FS (project) — Feasibility Study (project);

PD —  Project Documentation;

DDD — Detailed Design Documentation;

DS — Design Supervision.