Please Select Your Language

as of 30.01.2018

List of design and survey activities on the Russian territory carried out

by JSС «Morstroy»

Select the status of construction:

Status of construction:

select turnover



up 10 million/t

from 10 to 20 million/t

over 20 million/t

prospective

are begin designed

under construction

constructed




Object

Design stage*

Status of con-struction / op-eration


п/п

Client

Facilities

Technical indices

Design car-go turnover,

million tons/year

Oil, gas and oil products transshipment complexes

1

LLC TsUP VSTO,

OJSC «AK Transneft»

Specialized oil seaport «Kozmino». The first stage of a pipeline system «Eastern Siberia — the Pacific ocean»

DDD,

DS

Marine facilities of the port

1 Phase Constructed

in 2009

 

Full development
in 2012

15,0 — first stage,

30,0  — completely developed

OJSC «Taganrogsky sudoremontny zavod»

2

Taganrogsky shipyard. Oil products transshipment complex

Hydrotechnical facilities of the complex

DDD,

DS

Constructed

in 2006

0,5

3

OJSC «Lukoil-Severozapad-nefteproduct»

Vysotsk port.  Oil production distribution and transshipment complex LUKOIL-II

DDD,

DS

Hydrotechnical facilities of the complex

Constructed

in 2004

10,5

4

LLC «NT Belokamenka»

Offshore oil transshipment complex near the village of Belokamenka in the waters of  Kola Bay

Offshore anchorage of storage tanker

DOI,

DDD,

DS

Constructed

in 2004

12,0

5

CJSC «PNT»

St-Petersburg seaport.

St.Peterburg oil terminal

DDD,

DS

Hydrotechnical facilities of berths No.  1, 2, 3, 4,  112,  112-а

Constructed

in 1998–2003

15,3

LLC «Murmanskoy morskoye parokhodstvo»

6

Offshore oil transshipment complex at the inner roadstead of Kola Bay, further south than Mishukov Cape

Offshore anchorage of carrier-tanker

DOI,

 DDD,

 DS

Constructed

in 2003

5,0

7

MPA St-Petersburg,
LLC «Arktur», 
OLGI TRADE TRANSPORT & CONSTRUCTION AG, CJSC «PNT»

Oil products offshore transshipment complexes in the Gulf of Finland waters

DOI,

 РП,

DS

Offshore quays for oil products handling on the waters of anchorage  No. 5а, on the crossing of navigable channel No. 16а and St-Petersburg sea channel.

Constructed

in 1998–2003

5,2

LLC «Sibur-Portenergo»

Ust-Luga commercial seaport. LPG transshipment complex

Offshore and onshore complex facilities

8

DOI,

PD,

DDD,

DS

Constructed

in 2013

4,0

Russian  bulk oil complex «Vistino» in Ust-Luga port

9

LLC «Severo-Zapadny Alians»

 

 

DOI,

PD

Offshore and onshore complex facilities

 

 

According to Client’s plans

 

 

10,0–18,0

 

 

 

Multiconsult Shtokman Development AG

10

Port transport and technological complex of integrated development of  Shtokman gas condensate field, phase 1

Offshore complex facilities

FEED

According to Client’s plans

 

 

7,5

Port transport and technological complex of integrated development of  Shtokman gas condensate field, phase 1

11

Multiconsult Shtokman Development AG

Site preparation for onshore objects construction

PD

According to Client’s plans

10,0–18,0

 

CJSC «NIPI InzhGeo»

Pipeline system «Eastern Siberia— the Pacific Ocean». Bulk oil terminal in Perevoznaya Bay

 

Terminal marine facilities

12

DDD

Relocated

to Kozmina bay

 

80,0

Specialized oil seaport «Kozmino». First stage of pipeline system  «Eastern Siberia —the Pacific Ocean»

PD

13

LLC TSUP VSTO,

OJSC «AK Transneft»

 

 

Options of  the single mooring point,  type CALM

Fixed berths option accepted

30,0

LLC «Neste St-Petersburg»

St-Petersburg sea port. Marine cargo district Bronka. Oil products transshipment terminal

14

Marine facilities

DOI

Converted into Ro-Ro terminal

2,4

Temporary offshore transshipment complex in the waters of the middle knee of Kola Bay  between Cape Tuhmachkin and Cape Krasnoscel’e

15

LLC «RPK-Nord»

Temporary offshore transshipment complex of storage tanker «Umba»

DOI,

PD,

DDD,

DS

Constructed

in 2015

 

12,0

LLC «Gazprom proektirovanie»,

LLC «NIPI NG «Peton»

 

 

Complex for the production, storage and offloading of liquefied natural gas in the vicinity of the compressor station «Portovaya»

Marine facilities

16

DOI,

IS,

PD,

DDD,

DS

Under con-struction since 2017

1,5

17

Seaport in the district of Sabetta settlement on the Yamal Peninsula. Main facilities of the seaport

OJSC «Yamal LNG», OJSC «MRTS»

Foundation of the technological trestle. Shore protection, networks and roads of the South-Eastern ice barrier facility

PD,

DDD,

DS

Constructed

in 2017

16,5

LLC «Gazprominvest»

Terminal for the reception, storage and regasification of  LNG in Kaliningrad region

Protective structure

18

DOI,

IS,

DDD

Under con-struction since

с 2016

 

 

2

Temporary offshore transshipment complex in the waters of Murmansk port in the area of Cape Filinski

19

LLC «LK Volga»

Temporary offshore transshipment complex for «Kola» storage tanker

DOI,

PD,

DDD,

DS

Constructed

в 2017

12,0

Total:

Oil, gas and oil products transshipment complexes have been designed

Of which:

Constructed

Under construction

Prospective

19

11

2

6

General, bulk and universal cargo transshipment complexes

North European gas pipeline  «Russia—Germany» (Nord stream)

20

LLC «Gazprom invest Zapad»,

OJSC «Giprospetsgaz»

Handling quays for heavy-weight and construction cargoes «Portovaya»

DDD,

DS

 

 

Constructed

in 2010

 

 

0,5

OJSC «Kompania Ust-Luga»

Ust-Luga Commercial seaport. Multipurpose  transshipment complex «Yug-2»

Offshore and onshore complex facilities

 

 

21

PD,

DDD

 

 

First Phase constructed

in 2008

4,8

 

Football stadium in the western part of Krestovsky Island, St-Petersburg  (Kirovsky stadium)

PD,

DDD,

DS

 

Constructed

in 2008

22

LLC «Avant»

Construction quay

0,5

LLC «PO Kirishinefteorgsintez»

Chernaya river, Leningrad region

LLC «KINEF» handling point of large-capacity equipment

23

DDD

Constructed

in 2005

0,5

Taganrogky shipyard. Grain terminal

24

OJSC «Taganrogsky sudoremontny zavod»

Ship repairing quay  — big repairs

DDD

Constructed

in 2002–2005

 

 

2,0

 

 

 

OJSC «Taganrogsky su-doremontny zavod»

Azov. Grain terminal

Berthing facilities of grain terminal

25

DDD

Constructed

in 2003

 

 

0,7

 

Murmansk. Coal terminal at  the quay No. 4

26

OJSC «Murmansky morskoy torgovy port»

Additional equipment  of  the quay for accepting «Panamaks» type ships

DDD

Constructed

in 2003

 

 

2,0

MPA «Eysky morskoy port»,

OJSC «Eysky MTP», MA of Eyskoye shipping company, LLC «Direktoria-NMP»

Eysk sea port

Bank slopes,

berth, quay No. 2 — big repairs

 

27

DDD

Constructed

in 1999–2002

 

 

4,0

 

 

 

St-Petersburg sea port. Baltic bulk terminal

28

St-Petersburg MPA

Berth No. 107 in  the coal terminal

FS,

DDD, DS

Constructed

in 2002

5,0

CJSC «Kronimeksport»

Kronshtadt. Transshipment complex for general and refrigerated cargoes

 

 

Offshore and onshore complex facilities

 

 

29

DOI,

PD

 

 

According to Client’s plans

 

 

2,3

 

 

 

Grain terminal of complex «Taman»

30

LLC  «Feeding ingredients»

Cargo quays No. 3 and  No. 4

DDD

Constructed

in 2011

 

 

5,5

LLC «NPF «GT Inspect»

Shipbuild plant  «Red barricades»,

Ikryansky region, Astrahan

 

 

 

Assembly site with specialized waterfront

31

PD

Constructed

in 2015

 

 

0,1

Handling terminal,

Murmansk, Kola Bay

 

32

OJSC «MMC «Norilsk nickel»

Repair of quay  No. 1 and reconstruction of quay No. 2

 

PD,
DS

1, 2, 8  Phases constructed

in 2011,

4, 5, 9  Phases constructed

in 2014

1,5

SC «Yamal LNG»,

LLC «MRTS Engineering»

 

 

Sea port in the district of  Sabetta settlement on the Yamal Peninsula, including the creation of the navigable approach channel in the Gulf of Ob

The objects of the preparatory period. Berths and onshore facilities

 

 

33

DOI,

PD,

DDD,

DS

Quays 1, 2, 3, 4

constructed

in 2015

2,5

Saint-Petersburg Seaport. The third district of the seaport. litera BF, road to Turukhtannye Islands

34

The FSUE «Rosmorport»

 Saint Petersburg branch

 

 

Berthing complex for icebreakers moorage

FEED,

PD,

DDD,

DS

 

Constructed
in 2015 г.

SC «Yamal LNG»,

LLC «ZapSibGidrostroy»

 

 

Sea port of Sabetta on the Yamal Peninsula. Objects of the preparatory period

 

 

Quays  No. 5 and  No. 6

35

PD,

DDD,

DS

 

 

Constructed
in 2016 г.

1,0

(60 modules

per year)

 

 

Development of transport hub «Vostochny-Nakhodka»
(Primorsky Krai)

36

FTI «Rostrans-modernization»

Universal production and transshipment complex «North». Marine part

PD

Under construction since
с 2015 г.

Phase 1 – 14,0;

full development – 20,0

Total:

General, bulk and universal cargo transshipment complexes have been designed

OF which:

Constructed

Under constucted

Prospective

17

15

1

1

Container terminals

St-Petersburg sea port.

First container terminal

PD,

DDD,

DS

Constructed

in 1999–2007

37

OJSC «St-Petersburg sea port»,

CJSC «Pervy kontainerniy terminal»

Development and modernization of technologies and equipment, reconstruction of pavement and engineering utilities

1,0 million TEU or

12,0 million tons

 

FSUE «Rosmorport»,

LLC «Baltyskaya stividornaya compania»

Container terminal  in the scope of ferry complex in Baltysk, Kaliningrad region

Quays 1, 2 — pavement

38

PD,

DDD,

DS

1 Stage constructed

in 2006,

1 phase constructed

in 2011

0,2 million TEU or

2,4 million tons

Ust-Luga Commercial Seaport. Ust-Luga Container terminal

PD,

DDD,

DS

 

1 Stage

constructed

in 2011

39

CJSC (OJSC) «Ust-Luzhsky kontainerniy terminal»

Offshore and onshore facilities of the complex

0.4 million TEU

or 5,2 million tons

40

CJSC (OJSC) «Ust-Luzhsky kontainerny terminal»

Ust-Luga Commercial Seaport. Ust-Luga Container terminal

Offshore and onshore facilities of the complex

PD,

DDD,

DS

2–4 Phases are under construction since 2011

2,56 million TEU or

30,7 million tons

St-Petersburg seaport.

Petersburg container terminal

DOI,

PD,

DDD

 

 

Under construction

since 2013

41

CJSC «Pervy kontainerniy terminal»

Quay No. 88 — area expansion

0,6 million TEU

or 7,2 million tons

LLC «Fenix»

St-Petersburg sea port. Marine cargo district Bronka. Compound container terminal

Offshore and onshore facilities of the complex

42

DOI,

PD,

DDD,

DS

 

1 Stage constructed

in 2015

 

 

2 Stage constructed in 2016

1 Stage – 0,5 million TEU or 6,0 million tons.

Full development: 1,45 million TEU

or17,0 million tons and 130 thousand cargo units

Total:

20 million tons

St-Petersburg seaport. Container terminal in Lomonosov

PD

According to Client’s plans

 

 

43

CJSC «Yantar»,

CJSC «Lomonosovsky gruzovoy terminal»

Offshore and onshore facilities of the complex

1 million TEU

or 12,0 million tons

44

CJSC «BSK»

Container terminal  in the area of quays No 1, 2 of ferry complex in Baltysk, Kaliningrad region

Reconstruction of Quay No. 2. Area expansion. Onshore facilities

PD

 

 

1-5 Stages constructed

in 2016

 

 

6 Stage under construction since 2016

Increase from 0,2 to 0,4 million TEU

or from 2 to 4 mil-lion tons

45

Container terminal in the scope of Multipurpose transshipment complex «Yug-2»

DOI,

PD,

DDD,

DS

1 Phase constructed in 2008;

2 constructed in  2010

OJSC «Kompania Ust-Luga»

Berthing and onshore complex facilities. The second stage of construction.

0,12 million TEU

or 1,4 million tons

46

OJSC «Kompania Ust-Luga»

Container terminal in the scope of  Multipurpose transshipment complex «Yug-2»

Berthing and onshore facilities of the complex. The third phase of construction

DOI,

PD,

DDD

According to Client’s plans

4,09 million tons

47

St-Petersburg seaport. Transporta-tion logistics center in the area of Bronka –Lomonosov

DOI

According to Client’s plans

 

 

OJSC «Nacionalnay Refrizheratornaya Compania»

Offshore and onshore complex facilities.

18,0,  including

1 million TEU

48

CJSC «Container terminal Saint-Petersburg»

Site No. 4 on the territory of CJSC «Saint-Petersburg Container terminal»

Logistics and warehouse facilities

DDD,

DS

1 Stage constructed

in 2015

0,23 million TEU

or 2,7 million tons

Total:

Container terminals have been designed

Of which:

Constructed

Under constructed

Prospective

13

7

3

3

п/п

Object

Client

Design stage

Facilities

Status ofconstruction/operation

Design cargo turnover, million tons/year

Passenger turnoverr, million passanger/year

Technical indices

Ferry and passenger complexes

49

SI MPA Kaliningrad

Cargo-and-passenger ferry terminal in the basin No. 3, Baltysk, Kaliningrad region

FS,

DDD,

DS

Constructed

in 2003

4160 units а/tr

or 0,1 million t

Quays.No. 1, 2. Onshore facilities

0,017

CJSC «Baltyskiye transportnie sistemy»

50

St-Petersburg seaport

Compound terminal for rolling cargo and containers at the quay No. 101

DDD,

DS

Constructed

in 2003

0,7

51

FSUE «Rosmorport»

Automobile and railway ferry complex in Ust-Luga commercial seaport

FS,

DDD,

DS

 

 

Constructed

in 2006

 

 

5,5

Complex of hydrotech-nical and onshore facilities

FSUE «Rosmorport»

52

Automobile and railway ferry complex in the basin No. 4, Baltiysk

Complex of hydrotechnical and onshore facilities

FS,

DDD,

DS

Constructed

in 2006

0,8

53

LLC «Morskoy Fasad Sankt-Peterburg»

Marine passenger terminal on Vasilievsky Island

FS

Constructed

in 2010

718000 units а/tr or 14,4 million  tons

Complex of hydro-technical facilities,

onshore buildings and facilities

4,0

CJSC «River port «Marine facade»

54

Marine passenger terminal on Vasilievsky Island

The complex of hydroengineering and onshore facilities

PD

According to Client’s plans

1,5

55

CJSC «Institut «Stroyproject»

Bridge crossing the river Neva in the area No. 2 of the first stage of St-Petersburg Ring Motorway

FS,

DDD

Constructed

in 2003

Quay for river passenger ships and ice protecting dam

0,1

Total:

Ferry and passenger complexes have been designed

Of which:

Constructed

Under constructed

Prospective

7

6

1

Object

п/п

Client

Design stage*

Status of construction / operation

Technical indices

Dredging volume million m3

Facilities

Dredging works for approach channels and navigational basins

St-Petersburg seaport. Petersburg oil terminal

DDD,

DS

Constructed

in 2003

7,4

56

MPA of St-Petersburg

Dredging works in the opera-tional waters of the terminal

FSUE «Rosmorport»

Reconstruction of St-Petersburg sea channel

57

Dredging works  at navigable passage and the waters of Petersburg oil terminal and Baltic bulker terminal

DOI,

DDD,

DS

Constructed

in 2003

0,2

Vysotsk port. Distributing and transshipment oil products complex LUKOIL - II

PD,

DS

Constructed

in 2005

58

OJSC «RPK Vysotsk «LUKOIL II»

Dredging works  at navigable passage and terminal waters

1,3

OJSC «Petrolesport»

St-Petersburg seaport. Barochny basin waters

59

Dredging works  at navigable passage and waters

PD,

DS

Constructed

in 2005

0,9

Marine passenger terminal on Vasilievsky Island

60

FSUE «Rosmorport»

Dredging works  at navigable passage and terminal waters

FS,

DDD,

DS

Constructed

in 2008

22,5

FSUE «Rosmorport»

Automobile and railway ferry complex in Ust-Luga commercial seaport

61

Dredging works  at operational waters of the complex

FS,

DDD,

DS

Constructed

in 2006

4,0

Automobile and railway ferry complex in the basin No. 4, Baltiysk

62

FSUE «Rosmorport»

Dredging works  at navigable passage and waters

FS,

DDD,

DS

Constructed

in 2006

0,2

LLC «PSA Perspektiva»

Marine passenger terminal on Vasilievsky Island

 

63

Dredging works  from processing channel to construction quality

DDD,

DS

Constructed

in 2005

0,2

Handling district «Ekonomia». Arkhangelsk oil terminal

64

LLC «NK Rosneft NTC»

Dredging works at navigable passage and waters

PD,

DS

Constructed

in 2008

1,9

OJSC «Compania Ust-Luga»

Ust-Luga commercial seaport. Multipurpose transshipment terminal «Yug-2»

65

Dredging works at  the operational waters

PD,

DS

Constructed

in 2011

3,4

Ust-Luga commercial seaport. Ust-Luga container terminal

66

FSUE «Rosmorport»

Dredging works at  operational waters of the first start-up complex

PD,

DDD,

DS

Constructed

in 2009

4,0

FSUE «Rosmorport»

Ust-Luga commercial seaport

LPG transshipment terminal

 

 

67

Dredging works at  operational waters of the first start-up complex

PD,

DDD,

DS

Constructed

in 2013

1,4

Ust-Luga commercial seaport. Reconstruction of the southern approach channel

68

FSUE «Rosmorport»

Dredging works at navigable passage and turning basin

PD,

 DDD,

DS

Constructed

in 2009

7,3

FSUE «Rosmorport»

St-Petersburg marine channel. Approach channel and waters of MMTC «Bronka»

69

Dredging works at operational waters

PD,

DDD,

DS

1 Stage

constructed
in 2015

 2 Stage Constructed

in 2016

18,7

 

10,6

Ust-Luga commercial seaport. Ust-Luga container terminal

70

FSUE «Rosmorport»

PD,

DDD,

DS

Stage 1, 2 ― Constructed in

2013

Dredging works at  operational waters of the 2, 3, 4 start-up complexes

Stage 3, 4 ― according to client's plan.

2,4

 

5,4

FSUE «Rosmorport»

Ust-Luga commercial seaport. The northern approach channel

71

Dredging works at the northern approach channel

PD,

DDD,

DS

Constructed

in 2011

7,0

Ust-Luga commercial seaport. Service fleet harbour

72

FSUE «Rosmorport»

Dredging works at operational waters

PD,

DDD,

DS

Under construction

sine 2011

2,9

CJSC  «LGT»,  Firm «HOHTIF Aktsiengezelshaft»

Lomonosovsky cargo terminal

73

Dredging works at approach channel and operational waters of the terminal

PD

According to Client's plans

 

15,9

Ust-Luga commercial seaport. Big ship fairway

74

FSUE «Rosmorport»

Dredging works in the vicinity of Seskar Island

PD,

DDD,

DS

Constructed

in 2011

0,2

FSUE «Rosmorport»

Ust-Luga commercial seaport. The western approach channel

75

Dredging works on approach channel and operating waters  of the terminal

PD,

DDD,

DS

Constructed

in 2011

1,3

Olya seaport in Astrakhan region

76

FSUE «Rosmorport»

PD

Constructed

in 2010

Dredging works at operational waters of rolling and general cargo transshipment complex

0,1

Boskalis BV

77

St-Petersburg sea port. New section of approach channel to the navigable passage С-1

Dredging works at the area from the entrance buoy to picket PK-352

 

 

DDD

Constructed

in 2008

8,3

78

LLC «Ratibor»

St-Petersburg sea port. Re-construction of the northern  Kronshtad channel

Dredging works at navigable channel

DDD

Constructed

in 2009

0,1

FSUE «Rosmorport»

St-Petersburg commercial seaport

79

Reconstruction of St-Petersburg sea channel. General plan of dredging works

IS

Constructed        in 2012–2016

38,3

St-Petersburg commercial seaport

80

FSUE «Rosmorport»

Reconstruction of
St-Petersburg sea channel

PD,

DS

Stage 1.1 ― constructed in 2013

Stage 1.2, 1.3 under construction 2016

0,4

 

2,2

FSI «Directorate of State Contracting Authority  for Marine Transport Development Programes»

81

Deep-water port in Baltiysk, Kaliningrad region (Hub)

Dredging works at approach channel and port waters

IS

According to Client’s plans

102,2

82

Ust-Luga commercial seaport

OJSC «Compania Ust-Luga»

General plan of dredging works at approach channels and waters

Plot plan scheme

of the port

 

 

Beginning

of construction

2008–2025

58,0

83

JSC «Yamal LNG»

Seaport near Sabetta settlement on the Yamal Peninsula, including creation of a navigable approach channel in the Gulf of Ob

Objects of the preparatory period. Approach channel and water area

DOI,

PD,

DDD,

DS

 
Constructed

in 2015

13,0

Seaport Big port of St. Petersburg

84

FSUE «Rosmorport»

Construction of berthing complex for holding of ice-breaking fleet in Saint-Petersburg seaport

PD,

DD

 

Constructed

in 2015

0,2

85

LLC «Gazprom proektirovanie»

LLC «NIPI NG «Peton»

 

Leningrad region,  the vicinity of the compressor station «Portovaya»

Dredging works in the waters

PD,

DDD,

DS

Under construction

2017

0,4

Total:

Dredging works for approach channels and navigational basins have been developed

Of which:

Constructed

Under construction

Prospective

32

26

3

3

 

Client

Object

п/п

Facilities

 

Design stage*

Status of construction /operation

Objects and facilities of seaport infrastructure

FSUE «Rosmorport»,

LLC «Baltyskaya dnouglubitelnaya kompania»

Marine passenger terminal on Vasilievsky Island, St-Petersburg (Marine Facade)

86

Navigational beacons on hydrotechnical foundation of approach channel

PD,

DDD,

DS

Constructed

in 2008

Marine passenger terminal on Vasilievsky Island, St-Petersburg (Marine Facade)

87

FSUE «Rosmorport»,

LLC «Baltyskaya dnouglubitelnaya kompania»

 

 

Navigational beacons on hydrotechnical foundation of Petrovsky channel

PD,

DDD,

DS

Constructed

in 2007

88

Boskalis BV,

FFE «Directorate of KZS Rosstroy»

Approach area of Kronshtad ship channel in navigable passage С-1

Rear navigational beacon RNB – 2: 45 m height on hydrotechnical foundation

DDD,

DS

Constructed

in 2008

Ust-Luga Commercial Seaport

PD,

DDD,

DS

 

 

Under construction since 2011

89

FSUE «Rosmorport»

Service fleet base

FSUE «Rosmorport»

Ust-Luga Commercial Seaport

Navigational beacons on hydrotechnical foundation of the southern approach channel «Luga approaching leading line»

90

PD

Constructed

in 2010

Ust-Luga Commercial Seaport

PD

According to Client’s plans

91

FSUE «Rosmorport»

Navigational beacons on hydrotechnical foundation  of northern approach channel

FSUE «Rosmorport»

Ust-Luga Commercial Seaport

Linear navigational range «Luga Marine Western»

92

PD

Constructed

in 2012

Ust-Luga Commercial Seaport

PD,

DDD,

DS

Constructed

in 2010

93

FSUE «Rosmorport»

Reconstruction of navigational safety system at outer marine approaches, I stage

FSUE «Rosmorport»

Ust-Luga Commercial Seaport

Reconstruction of navigational safety system at external marine approaches , II stage (Luga western channel. Luga western fairway)

94

PD,

DDD,

DS

Constructed

in 2011

Big port of St-Petersburg

PD,

DDD,

DS

Constructed

in 2015

95

FSUE «Rosmorport»

Construction of berthing complex for icebreakers moorage in St-Petersburg sea port

FSUE «Rosmorport»

96

Ust-Luga Commercial Seaport

1 Stage Constructed

in 2014

2 Stage - under constructed 2014

Port protecting facility of the southern basin area

PD,

DDD,

DS

97

JSC «Yamal LNG»,

LLC «MRTS Engineering»

 

 

Seaport near the settlement of Sabetta on the Yamal Peninsula. The main objects of the sea port

DOI,

PD,

DDD,

DS

Constructed

in 2016

Artificial land. The south - eastern  icebarrier facilities

FSUE «Rosmorport»

98

Saint-Petersburg Seaport. Marine cargo district Bronka

Linear range of «Bronka-2»

PD,

DDD,

DS

Constructed

in 2015

99

FSUE «Rosmorport»

Saint-Petersburg Seaport. Marine cargo district Bronka

PD,

DDD,

DS

Constructed

in 2015

Linear range of «Bronka-3»

100

LLC «Gazprominvest»

Storage and regasification LNG terminal in Kaliningrad region

IS,

DOI,

DDD,

DS

Under construction since 2016

Protective structure

JSC «Yamal LNG»

OJSC «MRTS»

 

 

Seaport near the settlement of Sabetta on the Yamal Peninsula. Main facilities of the seaport.

101

Root part of the south – eastern icebarrier facilities

DOI,

PD,

DDD,

DS

 

 

 
Constructed

in 2016

102

LLC «Gazprom proektirovanie»

LLC «NIPI NG PETON»

 

 

Leningrad region,  the vicinity of the compressor station «Portovaya»

DDD,

PD,

DS

Under construction since 2017

Protective structure, port fleet base

Total:

Objects and facilities of seaport infrastructure have been designed

18

Of which:

Constructed

13

Under construction

4

Under design

1

* Legend Design stages:

IS — Investment Substantiation

C — Concept;

DOI— Declaration of Intentions;

FEED — Front end engineering design;

FS (project) — Feasibility Study (project);

PD —  Project Documentation;

DDD — Detailed Design Documentation;

DS — Design Supervision.

  Total Cargo turnover of design projects Dredging
No.   Reloading complexes for oil, gas and oil products (million tons) Reloading complexes for general, bulk and universal cargo (million tons) Container terminals (million tons) Ferry and passenger complexes (million tons) Total cargo turnover (million tons) Dredging on approach channels and navigational basins (million m³)
1 Constructed 94,5 29,5 29,7 21,5 175,2 106,6
2 Under construction - 21,1 58,0 - 79,1 21,1
3 Under design - - - - - 142,2
4 Prospective 135,5 2,3 30,0 - 167,8 118,1