JSC «GT Morstroy»
DESIGNER SUPERVISION
Supervision services are provided at the facilities under construction (reconstructed) according to the project and detailed design documentation developed by GT Morstroy. This work is carried out under the contract and in strict accordance with SP 246.1325800.2016.
The main tasks of designer supervision:
• Control over compliance of construction and installation works with the project documentation and developed on its basis detailed design documentation;
• Solution of all technical issues with the project documentation and developed on its basis detailed design documentation, arising in the construction process;
• Updating of detailed design documentation and (or) project documentation, if required in the construction process.
Seaport near the settlement of Sabetta on the Yamal Peninsula. Construction berth No.3. Plunging of sheet pile into the anchor wall.
The temporary roads transshipment complex for “Umba” storage tanker. Check of the ground tackles completeness.
The temporary roads transshipment complex for “Umba” storage tanker. Transportation of gravity anchors weighing 200 tons.
Handling terminal OJSC “GMK “Norilsk Nickel” . Reconstruction of quay No.2. Fringe.
Ust-Luga Commercial Seaport. Reconstruction of quay pavement.
Protective facility of LNG terminal in Kaliningrad region. Installation of large diameter shells in the design position.
Activities
Front end engineering design (FEED)
Business planning
Engineering surveys
Desing
Desinger supervision
Certification of hydrotechnical facilities