RU EN
iso
Design objects

Design Institute “GT Morstroy”. Results of work during 1997–2018:

• 219,8  million t — design cargo turnover of port terminals, constructed on the basis of institute’s projects;

• 63,41 million t — design cargo turnover of under construction port terminals on the basis of institute’s projects.

 

• 117,2  million m³ of soil is developed during dredging of approach channels and basins on the basis of institute’s projects;

• 5,1 million m³ of soil is under development from 2010 on the basis of institute’s projects;

• 142,2  million m³ — dredging volume of approach channels and basins under design by the institute.

 

• 69 fixed berths with total length 13 581 m for vessels with DW from 5 to 150 thousand t were constructed on the basis of institute’s projects;

• 11 fixed berths with total length 2974 m has been constructing since 2014 year on the basis of institute’s projects.
 

• 57 projects of the Design Institute were approved by FSE “Glavgosexpertisa of Russia” for the period of  2002 to 2018 with the overall investment volume equal to 368,08 billion rub, including 95,88 billion rub financed by the State budget.

 

 Geography of Objects: 

    The objects constructed on the basis of Institute’s design are successfully maintained on water areas of Baltic, Barents, the Black, Azov, Caspian and Japanese seas, in ports of Russia, Finland, Estonia, Latvia, Lithuania and Ukraine.

List of GT Morstroy design work approved by Glavgosexpertiza of Russia

List of design and survey activities on the Russian territory carried out by GT Morstroy Design Institute in 1997–2016

List of foto of design work carried out by GT Morstroy Design Institute in 1997–2016

 

DESIGN INSTITUTE “GT MORSTROY” results of work:

 

Foto of design work carried out by GT Morstroy Design Institute: