RU EN
iso
News

26.05.2017

We obtained the positive conclusion of the FAU "Glavgosexpertiza of Russia" for the project documentation and the results of engineering surveys for the «Complex for the production, storage and offloading of LNG near the CS «Portovaya». Stage 1...

     We obtained the positive conclusion of the FAU "Glavgosexpertiza of Russia" No. 575-17/GGE-11155/04 dated 26.05.2017 for the project documentation and the results of engineering surveys "Complex for the production, storage and offloading of liquefied natural gas in the vicinity of the compressor station "Portovaya". Stage 1: Construction of the preparation period, marine export terminal to enable reception of construction materials for the construction of a liquefaction plant GHG (Leningrad oblast)".

     Recall, Design Institute ZAO "GT Morstroy", starting 2015, gradually developed: a Declaration of Intention, investment substantiations, design and working documentation of the 1st stage of the construction of the Complex for production, storage and offloading of liquefied natural gas (LNG) in the vicinity of the compressor station "Portovaya".

Go to all news

back