RU EN
iso
News

17.01.2017

The root part of the South-Eastern ice barrier facility within the boundaries of the artificial land was set into operation in seaport Sabetta.

     The root part of the South-Eastern ice barrier facility within the boundaries of the artificial land at the seaport of Sabetta was set into operation in accordance with a permit of the Federal Agency of Sea and River Transport.

     Design Institute ZAO "GT Morstroy" is the developer of project documentation and detailed design for the main facilities of seaport: the root part of the South-Eastern ice barrier facility, artificial land with shore protection, also the supervision over construction was carried out by our specialists.

     The root part of the South-Eastern ice barrier facility includes 4 areas: vertical shore protection with a length of 225 meters; vertical shore protection with a length of 1027 meters; vertical shore protection with a length of 1157 meters; slope shore protection with length of 400 meters.

Go to all news

back