I. Received favorable conclusions of FSI Glavgosexpertiza of Russia for the following projects:

No. Description of Works Customer Facility Location Conclusion No, date Participation
1 Project documentation and results of investigation surveys "Construction of the sea port facilities near Sabetta village at Yamal Peninsula including origination of the navigational ship channel in the Gulf of Ob. Amendments to the design documentation (2)”


OJSC “Yamal LNG”, OJSC “Lenmorniiproekt” Sabetta village, Yamal Region, Yamalo-Nenetsky Autonomous District, the Tyumen Region No. 1108-15/GGE-8066/04 dated 18/08/2015; No. 1112-15/GGE-8066/10 dated 18/08/2015


 
Subcontractor:
- by the preparatory period facilities:
1. Berths No. 1, 2, 3, 4;
2. Engineering infrastructure;
3. Reconstruction of berth No.1 for fuel dock;
4. Berths No.5, 6.
- by main facilities of the sea port:
1. Root section of SEIB;
2. Engineering infrastructure at the root section of SEIB;
3. Base of the process trestle;
4. Complex security and fencing means of the sea port.

II. Received positive conclusions of the Directorate of the Main environmental review of the Federal Service for Supervision in the Sphere of Natural Resource Use for projects:

No. Description of Works Customer Facility Location Conclusion No, date Participation
1 Project documentation “Temporary roads transshipment complex” “RPK-Nord” LLC Middle limb of the Kola Bay, between the Tukhmachkin Bay and the Krasnoshchelie Cape Approved by the order of the Federal Service For Supervision in the Sphere Of Natural Resource Use (Rosprirodnadzor) for Northwestern Federal District

 
General Designer
 

III. ZAO “GT Morstroy” Design Institute has completed development of the project documentation:

  • Pre-Project proposals:
  1. Collection of effluent sewage in the Gulf of Ob under the “South Tambey gas condensate field”;
  2. Layout diagram of development of site No.2 of the Support Fleet Base in Ust Luga commercial seaport;
  3. Construction of a complex for LHCG transshipment. Vanino Port. Main layout concepts;
  4. Development of container terminal area, commercial port of Vladivostok;
  5. Location selection for the LHCG marine terminal in the Far Eastern Federal District, “SIBUR Holding” LLC;
  6. Reconstruction and upgrade of the Novorossiysk commercial seaport;
  7. Sea port in the area of settl. Sabetta at the Yamal peninsula, OJSC “Yamal LNG”. Creation of temporary approach sections for installation of bridge modules;
  8. Berth complex at the Signalniy Cape in Petropavlovsk-Kamchatski commercial seaport.
  • Investment substantiation:
  1.  ―
  • Declaration of Intent:
  1. The temporary roads transshipment complex for “Umba” storage tanker, “RPK-Nord” LLC, the Murmansk Region;
  2. The multifunction port complex within the “Gorskaya" production and business area, Saint Petersburg, “SPG Gorskaya” LLC;
  3. Facilities of the sea port infrastructure of the complex for production, storage and offloading of the liquefied natural gas (LNG) in the area of “Portovaya” CS of Vysotsk sea port;
  4. Terminal for receipt, storage and regasification of the liquefied natural gas (LNG) at the territory of the Kaliningrad region. Hydraulic structures;
  5. Reconstruction and upgrade of the Novorossiysk commercial seaport;
  6. Special terminal complex for grain transshipment. Reconstruction of berth No.3 with increase of cargo turnover by 5 million tons per year (considering extension of “NKKhP” LLC by 3 million tons);
  7. Reconstruction of “NZT” LLC with cargo turnover by 2 million tons per year;
  8. Special container terminal of “NMTP” PLC with increase of capacity up to 300 thous. TEU per year;
  9. Terminal for transshipment of mineral fertilizers at the East pier of “NMTP” PLC with design capacity up to 5 million tons per year;
  10. Special transshipment complex for bulk goods of OJSC “NSRZ” with capacity up to 10 million tons per year;
  11. General cargo terminal of “NMTP” PLC with design capacity up to 1.06 million tons per year;
  12. Special container terminal of OJSC “Novoroslesexport” with increase of high-capacity container transshipment up to 500 thous. TEU per year. 6th region and cargo berth No.1, 2, 3, 4, 5 of OJSC “Novoroslesexport”.
  • Project documentation:
  1. Construction of sea port facilities near Sabetta village at Yamal Peninsula including origination of the navigational ship channel in the Gulf of Ob. Amendments to the design documentation”, OJSC “Yamal LNG”. Introduction of alterations in the design documentation. Base of the process trestle at the SEIB;
  2. Construction of sea port facilities near Sabetta village at Yamal Peninsula including origination of the navigational ship channel in the Gulf of Ob. Amendments to the design documentation”, OJSC “Yamal LNG”. Introduction of alterations in the design documentation. Cargo berths No.5, 6;
  3. Introduction of alterations in the design documentation of MFMTC “Bronka”. 1st and 2nd construction stages;
  4. Berthing complex for holding anchorage of icebreaker fleet of FSUE “Rosmorport” in Saint Petersburg port. Project documentation correction. Power supply system;
  5. Introduction of alterations in the design documentation of “Baltic container terminal", city of Baltiysk, the Kaliningrad Region;
  6. The temporary roads transshipment complex for “Umba” storage taker, “RPK-Nord” LLC, the Murmansk Region.
  • Engineering documentation:
  1. Container site upgrade. Ust-Luga container terminal;
  2. Supply fleet base. Ust Luga commercial seaport;
  3. Coverage reconstruction of berths No.22, 23 of the timber transshipment complex in the Ust-Luga commercial seaport;
  4. Equipage of the point of passage across the State Border of the MFMTC “Bronka”;
  5. Introduction of alterations in the design documentation “Landscaping in the area of construction No.301. MFMTC “Bronka”;
  6. Calculation of electrical loads considering use of new territories. MFMTC “Bronka”;
  7. Adjustment of engineering documentation for berth No.2, bottom attachments. MFMTC “Bronka”;
  8. Canopy in the area of construction No.111. MFMTC “Bronka”;
  9. Adjustment of engineering documentation “Reconstruction of St. Petersburg maritime canal. Ship channel and water area of MFMTC “Bronka”;
  10. Pre-port car parking with servicing building. MFMTC “Bronka”;
  11. Mooring berths and onshore facilities “Sea port near Sabetta at the Yamal peninsula. Preparatory period facilities. Cargo berths No.5, 6;
  12. Construction of sea port facilities near Sabetta at the Yamal peninsula. Preparatory period facilities. Reconstruction of berth No. 1;
  13. Construction of sea port facilities near Sabetta at the Yamal peninsula. Main facilities of sea port. Base of the process trestle;
  14. Sea port in the area of settl. Sabetta at the Yamal peninsula. Main facilities of sea port. Root section of the south-east ice barrier (SEIB);
  15. Hydraulic base of SPR “Vremennyi” within construction of Western high-speed diameter, “St.-Petersburg, JSC Stroyproekt Institute”;
  16. Introduction of alterations in the engineering documentation of warehouses CJSC “St. Petersburg container terminal";
  17. The temporary roads transshipment complex for “Umba” storage taker, “RPK-Nord” LLC, the Murmansk Region;
  18. Temporary structures to ensure stability of berths No.88, 89, 90 in the Big port, Saint Petersburg;
  19. Calculation of bearing capacity of shell-type piles; Special sea oil port “Kozmino”;
  20. Reconstruction of the fire and potable water supply pipeline at CJSC ”International Paper”. “Tekhproekt” LLC.
  • Engineering Surveys:
  1. Engineering surveys at the territory of berths No.22, 23. Multi-discipline transshipment complex “Ug-2” in the Ust-Luga commercial seaport;
  2. For preparation of the design documentation of construction of “Baltic fertilizers terminal” facility;
  3. Topographical surveys (hydraulic construction of the complex) for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  4. Topographical surveys (maritime far approaches to the complex) for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  5. Engineering and hydrometeorological surveys (maritime component) for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  6. Geological engineering surveys for hydraulic structures for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  7. Geological engineering surveys for dredging at the far approaches (arrangement of sea navigable passages) for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  8. Geological engineering surveys for MOF berth for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  9. Geological engineering surveys for onshore buildings and structures for the facility “Complex for production, storage and offloading of the liquefied natural gas in the area of “Portovaya” CS;
  10. Geological engineering surveys at the water area for development of the design documentation for MFMTC “Bronka”, the third construction stage.

IV. The following construction has been commenced based on the design documentation developed by ZAO “GT Morstroy”:

  1. Development of “Vostochnyi – Nakhodka” transportation junction. General purpose production and transshipment complex “Sever” – maritime part.

The following construction has been commenced and designer supervision has been performed based on projects developed by ZAO “GT Morstroy”:

  1. The temporary roads transshipment complex for “Umba” storage taker, “RPK-Nord” LLC, the Murmansk Region;
  2. Construction of sea port facilities near Sabetta at the Yamal peninsula. Preparatory period facilities. Reconstruction of berth No. 1;
  3. Mooring berths and onshore facilities “Sea port near Sabetta at the Yamal peninsula. Preparatory period facilities. Cargo berths No.5, 6.

VI. The following construction is in process and designer supervision is performed based on projects developed by ZAO “GT Morstroy”:

  1. Construction of the port protecting structure in the Ust Luga commercial seaport, II stage, FSUE “Rosmorport”;
  2. Sub-assembly site of maritime works with special waterfront of OJSC “Shipbuilding Yard “Krasniye Barrikady”, Astrakhan city;
  3. Baltic container terminal JSC “Baltic Stevedoring Company”, city of Baltiysk, the Kaliningrad region;
  4. Berth No.2 of transloading terminal of OJSC “GMK “Nornikel” in Murmansk;
  5. Berth No. 88 of the seaport of Saint Petersburg, FSUE “Rosmorport”;
  6. The support fleet base in Ust Luga commercial seaport. Stage 2. Onshore facilities;
  7. Reconstruction of the St.-Petersburg channel. Ship channel and water area of MFMTC “Bronka”, II stage, CJSC “BaltStroy”;
  8. 2nd stage of construction of onshore buildings and structures of MFMTC “Bronka”, “Fenix” LLC;
  9. Transloading terminal of OJSC “GMK “Nornikel” in Murmansk. Onshore facilities;
  10. Sea port in the area of settl. Sabetta at the Yamal peninsula. Main facilities of sea port. Root section of the south-east ice barrier (SEIB);
  11. Construction of sea port facilities near Sabetta at the Yamal peninsula. Main facilities of sea port. Base of the process trestle;
  12. Logistical site for loaded container storage (Site No.4), 1st stage, commercial seaport “Saint Petersburg Big Port”.

VII. The following construction has been completed and designer supervision has been performed for the projects developed by CJSC “GT Morstroy”:

  1. Artificial land plot 2 at the water body: the Baltic Sea, the Gulf of Finland (Neva Bay), water area of the seaport “Big port of St. Petersburg”, for location of capital structures of federal significance of the Multi-function sea transshipping complex “Bronka”, “Fenix” LLC;
  2. Reconstruction of the St.-Petersburg channel. Ship channel and water area of MFMTC “Bronka”, CJSC “BaltStroy”. 1 stage of ship channel;
  3. Floating passage from berth No. 45 of JSC “MMRP” to the jack up floating drilling rig “GSP SATURN”, Murmansk, OJSC “Gazprom neft”;
  4. 1st stage of construction of onshore buildings and structures of MFMTC “Bronka”, “Fenix” LLC;
  5. Berthing complex for holding anchorage of icebreaker fleet of FSUE “Rosmorport” in Saint Petersburg port;
  6. Construction of sea port facilities near Sabetta at the Yamal peninsula. OJSC “Yamal LNG”. Preparatory period facilities. Cargo berths No.1, 2, 3, 4.
  7. Construction of sea port facilities near Sabetta at the Yamal peninsula. OJSC “Yamal LNG”. Preparatory period facilities. Onshore facilities.
  8. Construction of sea port facilities near Sabetta at the Yamal peninsula. OJSC “Yamal LNG”. Preparatory period facilities. Engineering infrastructure.

VII. The following hydraulic structures have been surveyed based on projects developed by ZAO “GT Morstroy” with preparation of the refillable certificate part:

  1. Automobile ramp of the Automobile and railway ferry complex of the Ust Luga commercial seaport.

VIII. The following hydraulic structure certificates have been prepared based on projects developed by ZAO “GT Morstroy”:

  1. Ship channel to MFMTC “Bronka” (the first stage);
  2. MFMTC “Bronka” water area;
  3. Berths No. 1, 2, 3, 4, 5, 6 of MFMTC “Bronka”;
  4. Ship channel to MFMTC “Bronka”. The first leading mark of the linear navigational range “Bronka-2” and “Bronka-3”;
  5. Ship channel to MFMTC “Bronka”. The back leading mark of the linear navigational range “Bronka-2” and “Bronka-3”;
  6. Coal port of the “Big port of Saint Petersburg” seaport, facility No.1;
  7. The temporary roads transshipment complex for “Umba” storage tanker berthing. OJSC “Murmansk Shipping Company", Murmansk.

IX. The following changes have been introduced in the hydraulic structure certificates:

  1. RPK-1 inshore mooring, OJSC “Murmansk Shipping Company", Murmansk.

 

back