RU EN
iso
News

31.12.2014

The results of work of the DESIGN INSTITUTE ZAO “GT Morstroy” for 2014

I. We obtained positive conclusions of FGU "Glavgosexpertiza of Russia" for the projects:

No. Name of work Client The location of the object No. of conclusion, date Participation
1

Project documentation and engineering survey results “Construction of a sea port objects in the district of Sabetta settlement on the Yamal Peninsula including the creation of a navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation”

Engineering surveys and project documentation (technical part)

OAO “Yamal LNG” Sabetta settlement on the Yamal Peninsula, Yamalo-Nenets autonomous region No.581-14/GGE-8066/04 dated 30.04.2014

 
The subcontractor of objects of preparatory
period, Southeast ice barrier facilities, onshore facilities
2

Validation of the estimated cost of object of capital construction for the project documentation “Construction of objects of sea port in the district of Sabetta settlement on the Yamal Peninsula including the creation of a navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation”

Project documentation (estimated)

OAO “Yamal LNG” Sabetta settlement on the Yamal Peninsula, Yamalo-Nenets autonomous region No. 590-14/GGE-8066/10 dated 5.05.2014 The subcontractor of objects of preparatory
period, Southeast ice barrier facilities, onshore facilities
3

Project documentation “Development of the transport hub “Vostochny-Nakhodka (Primorsky territory)”. The phase II. The objects of marine transport”.


Engineering surveys and project documentation (technical part)

FKU “Rostrans
modernization”
Wrangel Peninsula, Primorsky Krai No. 1107-14/GGE-9057/04 dated 15.09.2014 General designer of marine part
4

Validation of the estimated cost of object of capital construction of the project documentation “Development of the transport hub “Vostochny-Nakhodka (Primorsky territory)”. The phase II. The objects of marine transport”.


Project documentation (estimated)

 

FKU “Rostrans
modernization”
Wrangel Peninsula, Primorsky Krai No. 1108-14/GGE-9057/10 dated 15.09.2014 General designer of marine part
5 Project documentation and results of engineering surveys "Artificial land 2 on water object: Baltic sea, Gulf of Finland (Nevskaya Guba), water area of “Big port of St. Petersburg”, for placing of objects of capital construction of Federal value for Multipurpose offshore reloading complex “Bronka” OOO “Fenix”  Lomonosovsky district, Leningrad region No. 1540-14/GGE-9605/04 dated 8.12.2014  General designer

II. We received the positive conclusions of the Main environmental review of the Federal service for supervision in the sphere of nature use for projects:

No. Name of work Client The location of the object No. of conclusion, date Participation
1 Project documentation and engineering surveys results “Construction of objects of a sea port in the district of Sabetta settlement on the Yamal Peninsula including the creation of a navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation" OAO “Yamal LNG” Sabetta settlement on the Yamal Peninsula, Yamalo-Nenets autonomous region The order of FS for supervision in the sphere of nature
use No. 95 dated 17.02.2014

 
The subcontractor of objects of preparatory
period, Southeast ice barrier facilities, onshore facilities
2 Project documentation “Development of the transport hub “Vostochny-Nakhodka (Primorsky territory)”. The phase II. The objects of marine transport” FKU “Rostrans
modernization”
 
Wrangel Peninsula, Primorsky Krai The order of FS for supervision in the sphere of nature
use No. 112 dated 27.02.2014
General designer of marine part
3 Project documentation and engineering surveys results “Artificial land 2 on water object: Baltic sea, Gulf of Finland (Nevskaya Guba), water area of “Big port of St. Petersburg”, for placing of objects of capital construction of Federal value of Multipurpose offshore reloading complex “Bronka” OOO “Fenix” Lomonosovsky district, Leningrad region The order of the FS Department for supervision in the sphere of nature
use in the North-Western fed. district No. 245 dated 08.09.2014

 
General designer
4 Project documentation "Subassembly site for marine hydraulic facilities with specialized berthing front of OAO “Shipyard “Red barricades” OAO “Shipyard “Red Barricades” Astrakhan The order No. 1083 of the FS Department for supervision in the sphere of nature
use in the South fed. district
dated 23.05.2014
The subcontractor of the development of project documentation
5 Project documentation "Reconstruction of the approach channel to the quays Nos. 31-35 and water areas of quays Nos. 33-35 in the port “Vostochny” OOO “BC Maliy port” Wrangel Peninsula, Primorsky Krai The order No. 686 of FS Department for supervision in the sphere of nature use of the far Eastern Federal district dated 01.11.2013 General designer

 III. Design Institute ZAO “GT Morstroy” completed the development of project documentation:

  • Pre-proposal:
  1. Reconstruction of the oil terminal OOO “Oil-Bunker”, St. Petersburg;
  2. The substantiation for the parking of tankers on distribution and transshipment complex -1, OAO “Murmansk shipping company”, Murmansk;
  3. The construction of a deepwater port in Baltiysk (Updating), FGUP “Rosmorport”;
  4. The increase of turnover of the LPG terminal, Ust-Luga (marine part), OOO “SIBUR-Portenergo”;
  5. The Construction of entrance zone of Multipurpose offshore reloading complex “Bronka”, Leningrad region, OOO “Fenix”;
  6. The calculation of shoring of the cruiser Kutuzov in Novorossiysk, FGUP “Rosmorport”, General designer is OAO “LENMORNIIPROEKT”;
  7. Estimation of the possibility of setting of tanker “Volgoneft”, “Volgo-FLOT” on the terminal of ZAO “PNT”, St. Petersburg;
  8. The creation of system of management of broken ice in the port of Sabetta, Aker Arctic technology Inc, Norway;
  9. Estimation of the need for expansion of objects of the preparatory period in the port of Sabetta (marine part), OAO “Yamal LNG”;
  10. Recommendations for the creation of port infrastructure on the Yamal Peninsula in the port of Sabetta, FGUP “Krylov state research centre”.
  • Pre-investment feasibility study:
  1. The construction of the LNG regasification terminal in the Kaliningrad region, OAO “Giprospetsgaz”;
  2. The construction of the marine terminal for the plant “Baltic LNG” in Ust-Luga port, OAO “Giprospetsgaz”;
  3. The adjustment of the investment proposal for the construction of the “Regional distribution-cumulative cargo hub” at the mouth of the Luga river in Kingiseppsky district of Leningrad region, OOO “Transshipment point”.
  • Declaration of intent:
  1. The construction of the marine terminal for LNG plant on the Sakhalin Island, CB&I UR Limited, UK;
  2. The construction of the marine terminal for LNG plant on Sakhalin Island, Foster Wheeler, UK;
  3. The construction of the marine terminal for “LNG Plant-2 on the basis of gravity”, the Gulf of Ob, Gydansky Peninsula, OOO “ARCTIC LNG 2”.
  • Project documentation:
  1. Project documentation “Construction of objects of sea port near the Sabetta settlement on the Yamal Peninsula including the creation of a navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation”, OAO “Yamal LNG”;
  2. Project documentation “Development of the transport hub “Vostochny-Nakhodka (Primorsky territory)”. The phase II. The marine transport, FKU “Rostransmodernization”;
  3. Project documentation “Artificial land 2 on water object: Baltic sea, Gulf of Finland (Nevskaya Guba), water area of “Big port of St. Petersburg”, for capital construction of objects of Federal significance of Multipurpose offshore reloading complex “Bronka”, OOO “Fenix”;
  4. Project documentation “Subassembly site of marine hydraulic facilities with specialized berthing front of OAO “Shipyard "Red Barricades”, Astrakhan;
  5. Modification of the project “Reconstruction of the St. Petersburg channel. Approach channel and the water area of Multipurpose offshore reloading complex “Bronka”, ZAO “Baltstroy”.
  • Project and working documentation:
  1. Sea port near the Sabetta settlement on the Yamal Peninsula (updating of project documentation and the development of working documentation for the objects of the preparatory period), OOO “MRTS Engineering”;
  2. The project of upgrading of the site for the modules unloading of the plant for the gas preparation. Temporary berthing facilities, Odoptu Bay, Sakhalin Island, Fluor Daniel Inc., USA.
  • Working documentation:
  1. The device for the floating transition from the quay No. 45 OAO “MMRP” on self-elevating floating drilling outfit “GSP SATURN”, Murmansk, OAO “Gazprom Neft”;
  2. The construction of port protection structure in Ust-Luga port, the phase II, FGUP “Rosmorport”;
  3. The construction of onshore buildings and facilities of Multipurpose offshore reloading complex “Bronka”, adjusting of working documentation, OOO “Fenix”;
  4. Construction of quay No. 88, Sea Trade Port “Big port of St. Petersburg”, FGUP “Rosmorport”;
  5. The covering of quay No. 88, Sea Trade Port “Big port of St. Petersburg”, OOO “Sochimorstroy”;
  6. Construction of Southeast ice barrier facilities within the boundaries of the artificially-created land, the port of Sabetta, the Yamal Peninsula, OOO “MRTS Engineering”;
  7. Reconstruction of the St. Petersburg channel. Approach channel and the water area of Multipurpose offshore reloading complex “Bronka”, Stage II, ZAO “Baltstroy”.
  • Engineering surveys:
  1. For the execution of working documentation for Multipurpose offshore reloading complex “Bronka”;
  2. For the execution of working documentation for port protection structure of the South part of the Ust-Luga port. Plot No. 2;
  3. For the design of Artificial land 2 for Multipurpose offshore reloading complex “Bronka”;
  4. For the design of the Entrance area of Multipurpose offshore reloading complex “Bronka”;
  5. For the design of Reconstruction and technical re-equipment of main facilities of OAO “Baltic shipyard “Yantar”. The water areas of the embankments Nos. 5, 6, 7, 8, 9, Kaliningrad;
  6. For the design of the rear areas for storage of loaded containers (site No. 4) on the territory of ZAO “Container terminal Saint-Petersburg”.

IV. Construction and supervision started for the projects developed by ZAO “GT Morstroy”:

  1. Quays and onshore facilities “Sea port in the Sabetta settlement on the Yamal Peninsula”. Bank protection of the South-East ice barrier facilities. The contractor is OAO “MRTS”;
  2. Quays and onshore facilities “Sea port in the Sabetta settlement on the Yamal Peninsula”. The base of the process rack, the Contractor is OAO “MRTS”

V. Construction and supervision is being performed for the projects developed by ZAO “GT Morstroy”:

  1. Port protecting structure of water area of the South part of the Ust-Luga port. Site 2 (Phase 2);
  2. Subassembly site of marine hydraulic facilities with specialized berthing front of OAO “Shipyard “Red Barricades”, Astrakhan;
  3. Baltic container terminal OOO “Baltic stevedore company”, Baltiysk, Kaliningrad region;
  4. Quay No. 2 of transshipment terminal OAO “MMC “Norilsk Nickel” in Murmansk;
  5. Quay No. 88 of Sea port of Saint-Petersburg, FGUP “Rosmorport”;
  6. Quays and onshore facilities “Sea port in the Sabetta settlement on the Yamal Peninsula. The objects of the preparatory period”;
  7. Quays and onshore facilities of “Sea port in the Sabetta settlement on the Yamal Peninsula. The main objects of the seaport. Southeast ice barrier structure”;
  8. Base of port fleet in the trade Sea port of Ust-Luga. Phase 2. Onshore facilities;
  9. Onshore buildings and facilities of Multipurpose offshore reloading complex “Bronka”;
  10. Berthing facility for stay of icebreaking fleet of FGUP “Rosmorport” in the port of St. Petersburg;
  11. Transshipment terminal of OAO “MMC “Norilsk Nickel” in Murmansk. Onshore facilities;
  12. Rear area for storage of loaded containers (Site No. 3), Stage 1, Sea Trade port “Big port of St. Petersburg”.

VI. Construction has been completed and supervision has been performed for the projects developed by ZAO “GT Morstroy”:

  1. Port protecting structure of water areas of the South part of the Ust-Luga port. Site 1 (Phase 1of construction);
  2. Pump station of fire water supply (facility No. 97). Sea transshipment complex “Ug-2” in the Sea Trade port “Ust-Luga”.
back