I. We have obtained approvals from FSI “GlavGosExpertise of Russia” for the projects:

No. Name of work Client Object location Approval No., date Participation
1 Reconstruction of federal property objects at the Port of St-Petersburg. Construction of berthing complex for icebreakers fleet anchorage at the Port of St-Petersburg
“Rosmorport” St-Petersburg’s branch St-Petersburg,
3d sea port district, letter BF, road to Turukhtanniye islands
No. 058-10/GGE-6518/04 dated
01.02.2010.
General designer
2 Basin formation of the southern and northern parts of the Ust-Luga Trade Sea Port, including operational basin of the Leningrad region’s container terminal. Stage 5. Reconstruction of navigational safety system at the external approaches to the Ust-Luga Trade Sea Port. First Stage  “Rosmorport” Leningrad region, Kingiseppsky district, Luzhskaya bay of Gulf of Finland No. 178-10/SPE-0317/02 dated 16.04.2010. General designer
3 Project documentation “Ust-Luga Trade Sea Port. General cargo complex. Preliminary period objects. First stage” and implementation of engineering surveys package for development of the required documentation “Komania Ust-Luga” Leningrad region, Kingiseppsky district, Luzhskaya bay of Gulf of Finland No. 207-10/SPE-0997/02 dated 14.05.2010. General designer
4 Project documentation “Multidiscipline transloading sea complex Bronka”
“Fenix” St-Petersburg,
Lomonosov,
Y. Yefeta st.
No. 493-10/GGE-5820/04 dated 10.06.2010. General designer
5 Project documentation “Basin formation of the southern and northern parts of the Ust-Luga Trade Sea Port, including operational basin of the Leningrad region’s container terminal. Stage 4. Construction of the northern approach channel”
“Rosmorport” Leningrad region, Kingiseppsky district, Luzhskaya bay of Gulf of Finland No. 429-10/SPE-0317/02 dated 30.08.2010.;
No. 431-10/SPE-0317/05 dated 30.08.2010.
General designer
6 Project documentation “Reconstruction of container terminal site and construction of the berth No. 88” “Perviy Konteinerny Terminal” St-Petersburg,
3d sea port district, road to Turukhtanniye islands
No. 993-10/GGE-7022/04 dated 18.10.2010. General designer

 

II. Design Institute “GT Morstroy” has finished development of project documentation:

  • Feasibility study:
  1. Determination and analysis of optimum alternatives for liquid sulfur transportation from the Temryuk port.
  • FEED:
  1. Integrated development of Shtokman gas-condensate filed. Phase 1. Offshore facilities.
  • Declaration of Intentions:
  1. Reloading port complex “Vyborgskaya tselyuloza”, Sovetsky village, Leningrad region;
  2. Yuzhno-Tambeyskoye gas-condensate field. Reloading port complex.
  • Layout:
  1. Actualization of year 2010 general layout of the Ust-Luga Trade Sea Port;
  2. Reconstruction of the quay No. 82 CJSC “Pervy Kontainerny Terminal”.
  • Conceptual design:
  1. Integrated development of Shtokman gas-condensate field. Stage 1. Offshore gas condensate transshipment complex.
  • Pre-design proposals:
  1. Technical-and-economical proposals on construction of the offshore LNG terminal in Cheskaya Bay;
  2. Pre-design proposals on construction of the first stage of the marine terminal “Avrora” in the area of “Gorki” port complex in Kingeseppsky district Leningrad region;
  3. Integrated development of Shtokman gas condensate field. Stage 1. Evaluation of possible location of general port objects in Zavalishina Bay;
  4. Selection and justification design vessels navigational ways in the northern part of Obskaya bay.
  • Project documentation:
  1. Complex development of Shtokman gas-condensate field. Phase 1. Site preparation for construction of onshore objects of the transport - technological port complex;
  2. Reconstruction of the quay No.5 Eastern pier “NMTP” and quay No. 5 JSC “SRZ3». Construction of a new container terminal.
  • Working documentation:
  1. Objects and facilities of the Multipurpose transshipment complex Yug-2” in the Ust-Luga Trade Sea Port. Objects, financed by Investment Fund of the Russian Federation;
  2. Start-up complex No. 3 of the Multipurpose transshipment complex “Yug-2” in the Ust-Luga Trade Sea Port, the objects are located in the back area of the quay No. 1;
  3. Cargo quays No. 3 and No. 4 “Grain terminal complex Taman” in the port of Toman, Temrukovsky district, Krasnodarsky kray;
  4. Facilities of the phase 1, stage 1 of container terminal LLC “Baltiyskaya stividornaya companiya”;
  5. Liquefied hydrocarbon transshipment complex in the Ust-Luga Trade sea Port;
  6. Cofferdam dedicated for pipes broaching at Arkutun-Dagi field “Sakhalin 1”;
  7. Hydrotechnical facilities of the Multipurpose transloading sea complex “Bronka”.

III. Projects, developed by “GT Morstroy” in the beginning of construction and field supervision:

  1. Start-up complex No. 3 of the Multipurpose transshipment complex “Yug-2” in the Ust-Luga Trade Sea Port;
  2. Start-up complex No. 3 of the Multipurpose transshipment complex “Yug-2” in the Ust-Luga Trade Sea Port, objects are located in the back area of the quay No. 1;
  3. Cargo quays No. 3 and No. 4 “Grain terminal complex Taman” in the port of Toman, Temrukovsky district, Krasnodarsky kray;
  4. Facilities of the first phase, first stage of container terminal LLC “Baltiyskaya stividornaya companiya”;
  5. Container terminal in the Ust-Luga Trade Sea Port. First Stage;
  6. Northern approach channel to the Ust-Luga Trade Sea Port;
  7. Liquefied hydrocarbon transshipment complex in the Ust-Luga Trade sea Port.

IV. Completed construction and filed supervision of the projects developed by “GT Morstroy:

  1. Start-up complex No. 3 of the Multipurpose transshipment complex “Yug-2” in the Ust-Luga Trade Sea Port, the objects are located in the back area of the quay No. 21;
  2. Reconstruction (First Stage) of the navigational safety system for the external approaches to the Ust-Luga Trade Sea Port;
  3. Motor-Railway Ferry Complex in the Ust-Luga Trade Sea Port, third start-up complex;
  4. Motor-Railway Ferry Complex in the Ust-Luga Trade Sea Port, third start-up complex. Ferriy constituent. Complete development; including objects and facilities of the first and second phases of the vehicular constituent, and also manufacturing, assembly and testing of the linkspan.