RU EN
iso
News

28.12.2007

DESIGN INSTITUTE “GT MORSTROY” results of work per year 2007

I. Positive opinions have been received from FGU Glasgosekspertiza of Russia on the following projects:

No. Work name Customer Facility location Opinion number, date Function
1 Construction project: Norilsk Nickel Mining and Metallurgical Company OJSC transloading terminal
GMK Norilsk Nickel OJSC Murmansk, Leninsky Administrative District Departmental examination in Murmansk Region
No. 51 dated 26.02.2007
 
General designer
 2 Project: Petersburg Oil Terminal Reconstruction and Construction Neftekhimproyekt CJSC 32 Elevator Site, Ugolnaya Harbor, Saint Petersburg Glavgosekspertiza, North-West District Branch
No. 094-07/ FGGE NWFD-58 dated 05.06.2007
Marine facility subcontractor
3 Project: Ust-Luga Commercial Sea Port. Southern District. Multi-Purpose Transshipment Complex Ust-Luga Company OJSC Leningrad Region, Kingisepp District, Luzhskaya Bay, Gulf of Finland No. 498-07/GGE-4385/04 dated 06.07.2007 General Designer
4 Development project: Entrance Canal Reconstruction on the Section from PRR Ekonomiya to RN-Arkhangelsk-Nefteprodukt LLC Arkhangelsk Terminal Berths RN-Arkhangelsk-nefteprodukt LLC   Arkhangelsk, Severnaya Dvina River, Kuznechikha flow  No. 040ss-07/SPE-68 dated 22.08.2007 General Designer 
5 Project: Vistino Russian Marine Oil Loading Complex North-West Alliance LLC   Leningrad Region, Kingisepp District, Luzhskaya Bay, Gulf of Finland, near Vistino Village  No.780-07/GGE-5114/02 dated 29.10.2007  General Designer

 
II. GT Morstroy CJSC Design Institute has completed the development of the following design documentation:

  • Layout diagram:
  1. General layout of Ust-Luga commercial sea port with a total cargo tonnage of 120…150 million tpa.
  • Project:
  1. Construction of Vistino Russian marine oil loading complex, Ust-Luga District, Leningrad Region;
  2. Construction of a container terminal in Ust-Luga commercial sea port with a cargo tonnage of 2.85 million. TEU p.a.;
  3. Saint Petersburg maritime canal reconstruction. Entrance canal to Bronka multi-purpose marine transloading complex;
  4. Petersburg oil terminal reconstruction and construction;
  5. Construction of a transshipment terminal for rolling (automobile ferry) and general cargoes in Olia port, Astrakhan Region;
  6. First stage of Kozmino special sea oil port in East Siberia–Pacific Ocean pipeline system. Option with CALM type single point mooring facilities.
  • Project and detailed design documentation:
  1. Water area formation in the southern district of the Ust-Luga commercial sea port;
  2. Football stadium builders' berth in the western part of the Krestovsky Island, Saint Petersburg (Kirov stadium);
  3. Engineering support facilities for the construction of an inspection and search complex for bulky cargoes in the third district of the Saint Petersburg sea port.
  • Detailed design documentation:
  1. Start-up complex 2 of an automobile and railway ferry complex in Ust-Luga commercial sea port of Ust-Luega - Baltiysk - ports of Germany international train ferry service;
  2. Onshore buildings and facilities of South-2 multi-purpose transshipment terminal start-up complex 1 in Ust-Luga commercial sea port;
  3. Leading mark construction on a hydrotechnical foundation entrance canal of a marine passenger terminal on Vasilievsky Island, Saint Petersburg (Waterfront);
  4. Construction of an automobile lifting crossover ramp at berths 2 and 3 of a marine passenger terminal on Vasilievsky Island, Saint Petersburg.

III. Construction and field supervision started under the following projects developed by GT Morstroy CJSC:

  1. Start-up complex 2 of an automobile and railway ferry complex in Ust-Luga commercial sea port of Ust-Luga–Baltiysk–ports of Germany international railway ferry service;
  2. Full development facilities of a railway ferry complex in Basin 4, Baltiysk (Kaliningrad Region), of Ust-Luga–Baltiysk–ports of Germany international railway ferry service;
  3. Onshore buildings and facilities of South-2 multi-purpose transshipment terminal start-up complex 1 in Ust-Luga commercial sea port;
  4. Inspection and search complex for bulky cargoes in District 3 of Saint Petersburg sea port;
  5. Leading marks on a hydrotechnical foundation entrance canal of a marine passenger terminal on Vasilievsky Island, Saint Petersburg.

IV. Construction and field supervision completed under the following projects developed by GT Morstroy CJSC:

  1. Integrated transportation and production base of Lukoil-Nizhnevolzhskneft LLC, Astrakhan Region;
  2. Leading marks on a hydrotechnical foundation of Petrovsky fairway of a marine passenger terminal on Vasilievsky Island, Saint Petersburg (Waterfront).
back