RU EN
iso
News

30.12.2005

DESIGN INSTITUTE “GT MORSTROY” results of work per year 2005

I. Positive opinions have been received from FGU Glasgosekspertiza of Russia on the following projects:

No. Work name Customer Facility location Opinion number, date Function
1 Feasibility study for construction of a marine passenger terminal on Vasilievsky Island
Saint Petersburg Waterfront LLC Saint Petersburg No. 206-05/ GGE-2396/04 dated 30.03.2005 General designer
 2 (Draft) feasibility study: Integrated Transportation and Production Base for Lukoil-Nizhnevolzhskneft LLC  Lukoil-Nizhnevolzhskneft LLC Il'inka workers' quarters, Ikrianinsky District, Astrakhan Region  Glavgosekspertiza for Astrakhan Region
No. 210-01/2005 dated 29.07.2005
Berthing facility subcontractor 
3 Construction project: transshipment terminal on the basis of berth 29-1 of Odessa commercial sea port
Odessa commercial sea port Odessa Departmental examination in Murmansk Region no. 216 dated 10.06.2004 Ukrinvest-ekspertiza,
no. 190 dated 13.12.2005
Berthing facility subcontractor

II. GT Morstroy CJSC Design Institute has completed the development of the following design documentation:

  • Project correction:
  1. Construction of a train ferry complex in Basin 4, Baltiysk (Kaliningrad Region), of Ust-Luga–Baltiysk–ports of Germany railway ferry service;
  2. Automobile and railway complex in Ust-Luga commercial sea port of Ust-Luga–Baltiysk–ports of Germany railway ferry service.
  • Development project:
  1. Entry pier reconstruction in Kaliningrad maritime canal.
  • Detailed design documentation:
  1. Dredging the Petrovsky fairway, entrance canal and waters of a marine passenger terminal on Vasilievsky Island, Saint Petersburg (Waterfront);
  2. Heavy bulk equipment transshipment station on Chernaya River (Leningrad Region, Kirishi) as a part of Kirishi Nefteorgsintez Production Association LLC deep conversion plant.
  • Concept:
  1. Roadstead oil transshipment complex near Belokamenka Village in the Kola Bay, Murmansk Region;
  2. Preparatory-period facilities (dredging, land reclamation) on Area 2, Southern District, Ust-Luga commercial sea port.
  • Declaration of intentions:
  1. To build a liquid petrochemical product transshipment terminal for Vysotsk Commercial Sea Port CJSC.

III. Construction and field supervision started under the following projects developed by GT Morstroy CJSC:

  1. Integrated transportation and production base for Lukoil-Nizhnevolzhskneft LLC, Astrakhan Region;
  2. Transshipment complex on the basis of berth 29-1 of Odessa commercial sea port.

IV. Construction and field supervision completed under the following projects developed by GT Morstroy CJSC:

  1. Thoroughfare, entrance canal and maneuvering waters in Lukoil-II Vysotsk roadstead transshipment complex;
  2. Heavy bulk equipment transshipment station on Chernaya River (Leningrad Region, Kirishi) as a part of Kirishi Nefteorgsintez Production Association LLC deep conversion plant;
  3. Taganrog Ship Repair Yard OJSC grain and oil product transshipment berths.
back